Open Access in Inter-state Transmission Regulations, 2004 — First Amendment, 2005

Central Electricity Regulatory Commission (Open Access in inter-state Transmission) (First Amendment) Regulations, 2005

AmendmentDated 21 Feb 2005Published in the Gazette 23 Feb 2005In force from 1 Apr 2005No. L-7/25(5)/2003-CERC. dated 21st February, 2005

Amends the Open Access in Inter-state Transmission Regulations, 2004.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the CERC notification making the First Amendment to the 2004 Open Access in Inter-state Transmission Regulations. The Gazette header (p1) dates the issue to 23 February 2005; the notification itself is dated 21 February 2005 and numbered L-7/25(5)/2003-CERC (p19). The amendments come into effect on 1 April 2005 (p19; noted against the consolidated text at p58). The operative part runs from p19 to p39 and works by inserting, omitting or substituting specified regulations of the principal regulations. It inserts definitions (p19–20), omits the provisos to Regulation 4(iii) (p20), and substitutes Regulation 6 on allotment and reservation of transmission capacity, including long-term priority, congestion management, advance reservation and electronic bidding for congested short-term capacity (p20–25). Regulation 7 requires transmission licensees to declare existing long-term customers by 30 June 2005 (p25). The amendment revises application requirements and fees for long-term and short-term access (p25–26), inserts a bidding process at Regulation 13A (p26–27), substitutes rules on non-utilisation and surrender of short-term capacity (p27–29), preserves existing transactions (p29), and substitutes the transmission-charge methodology, operating charge, reactive-energy treatment, processing time schedules, day-ahead/same-day transactions, curtailment charging, commercial conditions, special energy meters and collection/disbursement provisions (p29–39). The annexure from p58 onward is a consolidated text of the 2004 principal regulations as amended, with the amendments marked. It reproduces definitions, customer categorisation, nodal agency arrangements, long-term and short-term procedures, transmission charges, UI and reactive-energy charges, curtailment priority, commercial conditions, metering, losses, Grid Code compliance, the web-based information system, grievance redressal and coordination (p58–82). A note at p39 says the principal regulations were published in the Gazette on 6 February 2004.

Standard name
Open Access Regulations
Primary topics
Open access, Open access charges, Congestion and curtailment

Read with this

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document