CERC · Central Electricity Regulatory Commission
Open Access in Inter-state Transmission Regulations, 2004 — First Amendment, 2005
Central Electricity Regulatory Commission (Open Access in inter-state Transmission) (First Amendment) Regulations, 2005
AmendmentDated 21 Feb 2005Published in the Gazette 23 Feb 2005In force from 1 Apr 2005No. L-7/25(5)/2003-CERC. dated 21st February, 2005
Amends the Open Access in Inter-state Transmission Regulations, 2004.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is the CERC notification making the First Amendment to the 2004 Open Access in Inter-state Transmission Regulations. The Gazette header (p1) dates the issue to 23 February 2005; the notification itself is dated 21 February 2005 and numbered L-7/25(5)/2003-CERC (p19). The amendments come into effect on 1 April 2005 (p19; noted against the consolidated text at p58). The operative part runs from p19 to p39 and works by inserting, omitting or substituting specified regulations of the principal regulations. It inserts definitions (p19–20), omits the provisos to Regulation 4(iii) (p20), and substitutes Regulation 6 on allotment and reservation of transmission capacity, including long-term priority, congestion management, advance reservation and electronic bidding for congested short-term capacity (p20–25). Regulation 7 requires transmission licensees to declare existing long-term customers by 30 June 2005 (p25). The amendment revises application requirements and fees for long-term and short-term access (p25–26), inserts a bidding process at Regulation 13A (p26–27), substitutes rules on non-utilisation and surrender of short-term capacity (p27–29), preserves existing transactions (p29), and substitutes the transmission-charge methodology, operating charge, reactive-energy treatment, processing time schedules, day-ahead/same-day transactions, curtailment charging, commercial conditions, special energy meters and collection/disbursement provisions (p29–39). The annexure from p58 onward is a consolidated text of the 2004 principal regulations as amended, with the amendments marked. It reproduces definitions, customer categorisation, nodal agency arrangements, long-term and short-term procedures, transmission charges, UI and reactive-energy charges, curtailment priority, commercial conditions, metering, losses, Grid Code compliance, the web-based information system, grievance redressal and coordination (p58–82). A note at p39 says the principal regulations were published in the Gazette on 6 February 2004.
Read with this
The regulation
- Dated 30 Jan 2004Open Access in Inter-state Transmission Regulations, 2004
Amendments and corrections
- Dated 7 Dec 2006Open Access in Inter-State Transmission (Amendment) Regulations, 2006
- Dated 13 Dec 2006Payment of Fee Amendment Regulations, 2006 — Gazette compilation of four amendments
- Dated 7 Aug 2009Changes some provisions: Grant of Connectivity, Long-term Access and Medium-term Open Access in inter-State Transmission Regulations, 2009
- Dated 25 Jan 2008Changes some provisions: Open Access in inter-State Transmission Regulations, 2008
Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.