Renewable Energy Tariff, RPO and REC Regulations, 2021 — 1st Amendment, 2022

Haryana Electricity Regulatory Commission (Terms and Conditions for determination of Tariff from Renewable Energy Sources, Renewable Purchase Obligation and Renewable Energy Certificate) Regulations, 2021, (1st Amendment) 2022

AmendmentDated 31 Mar 2022HERC/53/2021/1st Amendment/2022 dated The 31 st March, 2022

Replaced by Renewable Energy Tariff, RPO and REC Regulations, 2025

See that regulation for the date it took effect and for anything it keeps in force.

Amends the RE Tariff, RPO and REC Regulations, 2021.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on herc.org.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the first amendment to HERC's 2021 regulations on tariffs for renewable energy sources, renewable purchase obligation and renewable energy certificates. It was issued from Panchkula on 31 March 2022 as Regulation No. HERC/53/2021/1st Amendment/2022 and is a short, targeted instrument (p1).

Chapter 1 restates the short title, commencement and extent: the amendment applies to all grid-connected renewable energy projects and obligated entities in Haryana, and comes into force on publication in the Haryana Government Gazette (p1). Regulation 2 replaces Regulation 66 of the principal regulations, headed "Banking of RE Power" (p1).

The substituted provision makes RE-based captive generating plants eligible for the banking facility where not less than twenty-six per cent of ownership is held by a single captive user, up to contract demand for captive/own use, on payment of banking charges along with transmission and distribution losses (technical loss) for open access on the licensee's network, and for drawal of banked power from the Discoms after entering into a banking agreement with the concerned Discom (p1–2).

Only the notification date of 31 March 2022 is printed; the Gazette publication date that triggers commencement is not stated (p1–2).

Standard name
Renewable Energy Tariff Regulations, RPO Regulations, REC Regulations
Primary topics
Energy banking, Captive status

Read with this

The regulation

Voltaic last read HERC's website for final documents on 24 Nov 2026 (2 pages). A document HERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on herc.org.in ↗

Report an issue with this document