Haryana Electricity Regulatory Commission (Terms and Conditions for determination of Tariff from Renewable Energy Sources, Renewable Purchase Obligation and Renewable Energy Certificate) Regulations, 2021, (2nd Amendment) 2022

AmendmentDated 26 Dec 2022Published in the Gazette 3 Jan 2023Regulation No. HERC/53/2021/2nd Amendment/2022 dated The 26th December, 2022

Replaced by Renewable Energy Tariff, RPO and REC Regulations, 2025

See that regulation for the date it took effect and for anything it keeps in force.

Amends the RE Tariff, RPO and REC Regulations, 2021.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on herc.org.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

A two-part amendment from the Haryana Electricity Regulatory Commission, issued 26 December 2022 and published in the Haryana Government Gazette of 3 January 2023 (p1). Part One, Chapter 1, gives the short title, commencement and extent: it takes effect on gazette publication and extends to all grid-connected renewable energy projects and obligated entities in Haryana (p1).

The operative part, Regulation 2 (pp1–3), substitutes Regulation 62 of the 2021 RE Tariff, RPO and REC Regulations in full rather than amending individual sub-clauses. The substituted regulation re-lays the state's compliance architecture: a year-wise obligation split into Wind RPO, Hydro Power Purchase Obligation (HPO), Other RPO and Total RPO running FY 2023-24 to FY 2029-30, with total RPO rising from 27.08% to 43.33% over the period (pp1–2); eligibility rules defining which projects may fill each bucket, keyed to commissioning dates of 31 March 2022 for wind and 8 March 2019 for hydro, small hydro and pumped storage (p2); and the accounting basis for the obligation in energy terms.

It goes on to let the State/Discom meet HPO from hydro free power, with Hydro Energy Certificates or purchased hydro as fallback; provides annual truing-up of the HPO trajectory and defers the 2030-31 to 2039-40 trajectory to a later notification; allows shortfalls to be shifted between the Wind and Other RPO buckets; pegs the obligation of fossil-fuel captive plants of 5 MW and above at the level of their commissioning year; and preserves existing Commission-approved renewable PPAs (p2).

A second table (p3) creates an Energy Storage Obligation rising over the same years, treated as fulfilled only where at least 85% of stored energy comes from renewable sources, counted toward the total RPO, and subject to periodic review (p3).

Standard name
RPO Regulations, Renewable Energy Tariff Regulations, REC Regulations
Primary topics
Renewable purchase obligation (RPO / RCO), Energy storage obligation, Renewable energy certificates (REC)

Read with this

Voltaic last read HERC's website for final documents on 24 Nov 2026 (2 pages). A document HERC issued after the page that lists it was read may not be held by Voltaic yet.