Terms and Conditions for Determination of Tariff Regulations, 2009

The Rajasthan Electricity Regulatory Commission (Terms and Conditions for Determination of Tariff) Regulations, 2009

Consolidated copyDated 23 Jan 2009No. RERC/Secy/ Reg. -76 dated January 23, 2009

Replaced by a later regulation Voltaic does not hold

Voltaic does not show the regulation that replaces it, so check the regulator's website for it.

A consolidated copy of the Terms and Conditions for Determination of Tariff Regulations, 2004, published by RERC for reference. It may not include the latest amendments; read it with the amendments listed for the regulation.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on rerc.rajasthan.gov.in ↗

Summary

Summary written by software, from pages 1 to 22 of 72. Check the regulator's original before you rely on it.

This is the Rajasthan Electricity Regulatory Commission's notification dated 23 January 2009 making the RERC (Terms and Conditions for Determination of Tariff) Regulations, 2009, in short the RERC Tariff Regulations, 2009 (p1). It is issued under ss.42, 61 and 62 read with s.181 of the Electricity Act, 2003, extends to the whole of Rajasthan, and applies for tariff determination from FY 2009-10 (1 April 2009) up to FY 2013-14 (31 March 2014). Prior period and review matters up to FY 2008-09 remain governed by the 2004 Tariff Regulations. The Regulations come into force from gazette publication, but the Gazette date is not printed (p1).

Part I (pp1–8) is preliminary. Regulation 1 gives title, extent, commencement and applicability. Regulation 2 defines roughly seventy-five terms covering accounting statements, allocation statements, availability, declared capacity, deemed generation, design energy, control period, existing and new generating stations, useful life, renewable energy sources, non-firm power, other business, user, wheeling and tariff. Regulation 3 sets scope: supply by a generating company to a distribution licensee, intra-state transmission, wheeling, retail sale, open-access surcharge and additional surcharge; it also requires adoption of tariffs determined through transparent bidding under Central Government guidelines (p8).

Part II (pp8–16) sets the general multi-year framework. It establishes a five-year control period (p8), annual accounts and reports by 30 November (p8), forecast of aggregate revenue requirement and expected revenue by 30 November of the previous year with two forecast methodologies and a change-of-methodology procedure (p9), a performance trajectory (p10), annual performance review (pp10–11), treatment of controllable and uncontrollable factors with sharing of gains and losses (pp11–13), periodicity of tariff determination (p13), contents of a tariff petition (pp13–14), the Commission's order process and publication (pp15–16), subsidy payment by the State Government (pp15–16), and publication and communication of tariff orders (p16).

Part III (pp16–22) provides financial principles for computing costs and return: normative debt-equity (p16), capital cost and in-principle approval (pp16–17), additional capitalisation (pp17–18), consumer contribution, deposit works and grants (pp18–19), return on equity (p19), interest and finance charges on normative loans (pp19–20), depreciation on the straight-line method with Appendix-I rates (pp20–21), lease charges (p21), O&M expenses and escalation/WPI true-up (p21), bad and doubtful debts (p22), insurance and contingency reserve (p22), interest on working capital (p22), and foreign exchange rate variation and hedging (p22).

The supplied text refers to later parts that are not in this excerpt: Part VII for renewable energy tariffs (p13), Regulation 41 for Other Business (p14), Appendix-I for depreciation rates (p20), Annex-1 for abbreviations (p7), and separate Commission orders for forms and formats (pp8, 13).

Standard name
Multi Year Tariff Regulations
Primary topics
Tariff determination, Multi Year Tariff (MYT), ARR and true-up

Read with this

Voltaic last read RERC's website for final documents on 24 Nov 2026. A document RERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on rerc.rajasthan.gov.in ↗