RERC · Rajasthan Electricity Regulatory Commission

Terms and Conditions for Determination of Tariff Regulations, 2004

The Rajasthan Electricity Regulatory Commission (Terms and Conditions for Determination of Tariff) Regulations, 2004

RegulationDated 15 Oct 2004No. RERC/Secy/ Reg. -32 dated 15th October, 2004

Replaced by a later regulation Voltaic does not hold

Voltaic does not show the regulation that replaces it, so check the regulator's website for it.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on rerc.rajasthan.gov.in ↗

Summary

Summary written by software, from pages 1 to 34 of 53. Check the regulator's original before you rely on it.

The Rajasthan Electricity Regulatory Commission issued these principal tariff regulations on 15 October 2004 under section 61 read with section 181 of the Electricity Act 2003 (p1). They set the framework for RERC to determine generation, transmission, wheeling and supply tariffs in Rajasthan. They come into force on publication in the official gazette, but the gazette date is not printed; the tariff principles for a generating company or transmission licensee are stated to be valid only until 31 March 2009, with a review before that date (p1, p6–7).

Part I (pp1–7) lays down definitions, annual accounts and report filing by 30 November, the rule that tariff is ordinarily determined no more than once a year, petition requirements and supporting calculations, Commission scrutiny and publication requirements, communication of tariff orders, refund of excess recovery, adoption of section 63 competitive-bidding tariffs, first-year determination and annual review for generating companies and transmission licensees, and a power-purchase/fuel-cost adjustment mechanism.

Part II (pp7–14) sets general cost and return principles: debt-equity ratio, capital cost and capital structure, additional capitalisation, return on equity, interest and finance charges, depreciation and advance against depreciation, lease charges, O&M expenses, bad and doubtful debts, insurance and contingency reserve, working-capital interest, foreign exchange rate variation, income tax, unfunded pension and gratuity liability, delayed payment charges, and ceiling norms of operation.

Part III (pp14–15) classifies revenues: tariff income, other income, surcharge and additional surcharge, late-payment surcharge, rebates earned and prompt-payment rebates.

Part IV (pp16–28) deals with thermal generating stations. It defines availability, declared capacity, heat rate, PLF and related terms; provides for provisional and final tariff petitions; specifies two-part capacity and energy charges; sets norms of operation for target availability, target PLF, gross station heat rate, secondary fuel oil, auxiliary consumption and stabilisation; and gives the methodology for capital cost, infirm power, O&M, working capital, capacity charge computation and recovery, energy charges and fuel price adjustment, landed fuel cost, incentives, UI charges and anti-gaming, scheduling, demonstration of declared capability, metering and accounting, and billing/payment.

Part V (pp28–34) begins the hydro regime: hydro definitions, petition, two-part tariff, capacity index and auxiliary-consumption norms, capital cost and infirm power, O&M, working capital, SLDC/transmission charges, other income, annual capacity charge computation, recovery, primary and secondary energy charges, and incentives including early commissioning. Later parts and the Appendix of depreciation rates referred to in Regulation 19 are not included.

Standard name
Tariff Regulations
Primary topics
Tariff determination, Generation tariff, Transmission tariff

Read with this

Voltaic last read RERC's website for final documents on 24 Nov 2026. A document RERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on rerc.rajasthan.gov.in ↗