RERC · Rajasthan Electricity Regulatory Commission
Terms & Conditions for Determination of Tariff (Third Amendment) Regulations, 2006
Rajasthan Electricity Regulatory Commission (Terms & Conditions for Determination of Tariff)(Third Amendment) Regulations, 2006
AmendmentDated 21 Nov 2006No. RERC/Secy/ Reg 57 dated 21 November, 2006
Replaced by a later regulation Voltaic does not hold
Voltaic does not show the regulation that replaces it, so check the regulator's website for it.
Amends the Terms and Conditions for Determination of Tariff Regulations, 2004.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is the Third Amendment, 2006 to the RERC (Terms & Conditions for Determination of Tariff) Regulations, notified at Jaipur on 21 November 2006 under Section 61 read with Section 181 of the Electricity Act 2003. Its operative effect is twofold. Regulation 90(3) is deleted and the following sub-regulations renumbered (p1). More substantially, a new Part VIII on Renewable Energy Generating Stations is inserted, running from regulation 107 to regulation 115 (p1–10).
Part VIII opens with definitions — conventional power plants, nodal agency, non-firm power, renewable energy, RE power plants, renewable energy sources, tariff, interconnection point and total consumption (p1). It then applies the existing petition procedure of regulation 38 to RE tariff petitions (p1).
Regulation 109 obliges every distribution licensee, including deemed licensees, to endeavour to buy a rising minimum share of its total annual electricity purchase from renewables, with separate year-wise minimum and maximum-percentage schedules for wind and biomass (p2). No minimum is fixed yet for non-firm solar or 'other' sources until named capacity thresholds are commissioned in the State; shortfalls from natural vagaries are not defaults; percentages can be reviewed if retail rates are affected; and the Commission may review the quantum by March 2009 (p2–3).
Regulation 110 fixes tariff for existing wind and biomass plants covered by the 1999 and 2000 State policies and for plants commissioned by the stated cut-off dates, for ten years from PPA signing, with year-wise tariff tables (p3–4), and gives plants an option after ten operational years to terminate the PPA and sell to open access, captive or other buyers (p4). Regulations 111 sets out the cost-plus performance parameters for new wind and biomass plants (capital cost, debt-equity, return on equity, interest, life, depreciation, O&M and escalation, CUF/PLF, working capital, station heat rate, GCV, auxiliary consumption, biomass price indexation), the treatment of competitive bidding, biomass and co-generation, non-firm power tariff, CDM credit sharing and ABT applicability (p4–7). Regulations 112 to 115 then cover grid connectivity and evacuation planning by the STU, non-firm injection limits by line and voltage, start-up power, kVArh and MVArh charges, transmission and wheeling charges, surcharge formula, SLDC fees, transmission and distribution losses and banking of energy for third-party and captive use (p7–10).
Read with this
The regulation
- Dated 15 Oct 2004Terms and Conditions for Determination of Tariff Regulations, 2004
Amendments and corrections
- Dated 11 May 2006Terms & Conditions for Determination of Tariff (First Amendment) Regulations, 2006
- Dated 18 Aug 2006Terms & Conditions for Determination of Tariff (Second Amendment) Regulations, 2006
- Dated 29 Mar 2007Terms & Conditions for Determination of Tariff (Fourth Amendment) Regulations, 2007
- Dated 23 Dec 2009Terms and Conditions for Determination of Tariff (First Amendment) Regulations, 2009
- Dated 24 May 2011Terms and Conditions for Determination of Tariff (Second Amendment) Regulations, 2011
- Dated 18 Nov 2011Terms and Conditions for determination of Tariff (Third Amendment) Regulations, 2011
Consolidated copies, for reference (1)
- Dated 23 Jan 2009Terms and Conditions for Determination of Tariff Regulations, 2009
Voltaic last read RERC's website for final documents on 24 Nov 2026. A document RERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.