Terms and Conditions for determination of Tariff (Third Amendment) Regulations, 2011

Rajasthan Electricity Regulatory Commission (Terms and Conditions for determination of Tariff) (Third Amendment) Regulations, 2011.

AmendmentDated 18 Nov 2011RERC/Secy/ Reg. 90 dated 18th November, 2011

Replaced by a later regulation Voltaic does not hold

Voltaic does not show the regulation that replaces it, so check the regulator's website for it.

Amends the Terms and Conditions for Determination of Tariff Regulations, 2004.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on rerc.rajasthan.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

A three-paragraph amendment by the Rajasthan Electricity Regulatory Commission, issued at Jaipur on 18 November 2011 as Notification No. RERC/Secy/Reg. 90 (p1). It rewrites one biomass fuel price clause of the RERC (Terms and Conditions for determination of Tariff) Regulations and replaces the whole of Regulation 84's indexation and variable-charge machinery. It comes into force on publication in the official Gazette, but no Gazette date is printed, so the exact in-force date cannot be fixed from the document (p1).

Paragraph 2 (p1) replaces Regulation 83(7)(b)(v), splitting biomass fuel price into two regimes — one for projects in place before the amendment and one for plants commissioned during the 2009–14 control period — each with a base-year price and a producer's option between index linkage and a flat annual escalation. The figures it moves are the point of the amendment: a base biomass price of Rs. 1216 for FY 2009-10 and of Rs. 1830/MT for FY 2011-12 (p1, p3).

Paragraph 3 (p1–3) replaces Regulation 84(1) and (2). The new sub-regulations (1)(a) and (1)(b) set out the year-on-year fuel price indexation formula — labour, fuel and transportation weights applied to wholesale price index, an inflation-rate term and a diesel price term — separately for pre- and post-amendment projects, with default weights to apply until the Commission revises them. Sub-regulations (2)(a) and (b) convert those prices into a variable charge per unit, again by project vintage, using station heat rate, gross calorific value, auxiliary consumption factor and the biomass price (p3).

Standard name
Tariff Regulations
Primary topics
Fuel price and supply, Renewable energy tariff, Tariff determination

Read with this

Voltaic last read RERC's website for final documents on 24 Nov 2026. A document RERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on rerc.rajasthan.gov.in ↗

Report an issue with this document