RERC · Rajasthan Electricity Regulatory Commission

Terms & Conditions for Determination of Tariff (Second Amendment) Regulations, 2006

Rajasthan Electricity Regulatory Commission (Terms & Conditions for Determination of Tariff) (second amendment) Regulations, 2006

AmendmentDated 18 Aug 2006No.RERC/Secy/Reg 52 dated 18 August 06

Replaced by a later regulation Voltaic does not hold

Voltaic does not show the regulation that replaces it, so check the regulator's website for it.

Amends the Terms and Conditions for Determination of Tariff Regulations, 2004.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on rerc.rajasthan.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the second amendment to the Rajasthan Electricity Regulatory Commission's principal tariff-determination regulations of 2006, issued on 18 August 2006 (p1). It does not restate the parent regulation; it inserts, substitutes and deletes a targeted set of provisions across the tariff-determination framework.

The amendments cover several distinct areas. On process, they allow the Commission to initiate tariff proceedings on its own motion if a licensee fails to file a petition within one and a half months after submitting its annual accounts (p1), and add a provision for the Commission to determine tariff based on cost of supply while separately indicating the subsidised tariff reflecting the State Government's subsidy commitment (p1).

On financing, they permit foreign-currency loan swapping with the cost treated as part of interest and finance charges (p1), change the ceiling on Return on Equity to CERC-specified limits while allowing a higher RoE for distribution licensees (p1), and change the conversion basis for foreign-currency equity (p1). They also add a new provision on cost of hedging for foreign-exchange variation (p1).

On cross-cutting charges, they add provisions for sharing clean development mechanism benefits between generating companies, licensees and distribution licensees (p1), for reflecting transmission losses in transmission charges (p1), and for determining average distribution losses at each voltage level for wheeling charges (p2). On technical/consumer charges, they add 'fixed charge' units of Rs per kW per month to regulation 80 (p2), replace a ten-year subsidy-elimination timeline with a cap on subsidy as a share of cost of supply by 2010-11 (p2), and delete a provision in regulation 98 (p2).

The regulation comes into force from publication in the official gazette, which is not printed in this text (p1).

Standard name
Tariff Regulations
Primary topics
Tariff determination, Cost of supply and cost allocation, Return, financing and working capital

Read with this

Voltaic last read RERC's website for final documents on 24 Nov 2026. A document RERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on rerc.rajasthan.gov.in ↗

Report an issue with this document