Skip to content

TSERC · Telangana State Electricity Regulatory Commission

Framework for Resource Adequacy Regulation, 2026

Telangana Electricity Regulatory Commission (Framework for Resource Adequacy) Regulation, 2026

RegulationDated 24 Feb 2026REGULATION NO. 03 OF 2026 dated 24.02.2026

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on tgerc.telangana.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

The Telangana Electricity Regulatory Commission (Framework for Resource Adequacy) Regulation, 2026 — Regulation No. 03 of 2026 — is a principal state regulation that builds a planning-and-procurement discipline around resource adequacy. It is made under s.181 of the Electricity Act 2003 read with ss.61, 66 and 86, and applies to generating companies, distribution licensees, the State Load Despatch Centre, transmission companies and other grid-connected entities in Telangana (p1–2). It takes effect on publication in the Telangana Gazette; the signing date is 24.02.2026 (p1, p25).

Chapters 2 to 4 set the machinery. The framework is a 10-year rolling exercise covering demand assessment, generation resource planning, transmission and distribution network planning, procurement planning and monitoring (p5). Distribution licensees must produce long-, medium- and short-term demand forecasts using CEA forecast guidelines, prescribed statistical methods and multiple demand scenarios, and must feed category-wise consumption data upward each year; SLDC aggregates a state-level forecast for CEA, NLDC and RLDC (pp5–9).

Chapter 4 deals with generation resource planning: capacity crediting of contracted resources (with a detailed net-load method for wind and solar, and separate bases for hydro, thermal, storage and RE), assessment of a planning reserve margin against reliability indices, and identification of the resource gap from a 15-minute-or-longer resource map. It also routes the State's share in the national peak through CEA's LT-NRAP and NLDC's ST-NRAP (pp9–16).

Chapter 5 governs procurement: optimal resource mix, least-cost modelling, contract tenure, capacity sharing, prior Commission approval for new tie-ups and for PPA/PSA/Power Supply Agreement changes, and a window for emergency procurement without prior approval (pp16–19).

Chapters 6 to 7 impose compliance and a dense annual calendar of deadlines rolling from April data submission through May forecasts and capacity-credit factors, September filing with CEA, October filings with the Commission, and March contracting of any balance shortfall (pp19–23). Chapter 8 adds website disclosure, merit-order publication, mandatory planning and round-the-clock cells, consultation duties, and the Commission's powers to issue orders, relax, remove difficulties and amend (pp23–25). Annexure I details the modelling methodology and constraints; Annexure II lists 14 reporting formats (pp26–30).

Standard name
Resource Adequacy Framework
Primary topics
Resource adequacy, Power procurement and PPAs, Network planning and investment

Read with this

Procedures and orders made under it

Other copies of these documents (1)

Earlier drafts

Voltaic last read TSERC's website for final documents on 24 Nov 2026 and for drafts on 21 Nov 2026. A document TSERC issued after the page that lists it was read may not be held by Voltaic yet.

As of its reading of TSERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on tgerc.telangana.gov.in ↗

Report an issue with this document