The Telangana Electricity Regulatory Commission (Framework for Resource Adequacy) Regulation, 2026 — Regulation No. 03 of 2026 — is a principal state regulation that builds a planning-and-procurement discipline around resource adequacy. It is made under s.181 of the Electricity Act 2003 read with ss.61, 66 and 86, and applies to generating companies, distribution licensees, the State Load Despatch Centre, transmission companies and other grid-connected entities in Telangana (p1–2). It takes effect on publication in the Telangana Gazette; the signing date is 24.02.2026 (p1, p25).
Chapters 2 to 4 set the machinery. The framework is a 10-year rolling exercise covering demand assessment, generation resource planning, transmission and distribution network planning, procurement planning and monitoring (p5). Distribution licensees must produce long-, medium- and short-term demand forecasts using CEA forecast guidelines, prescribed statistical methods and multiple demand scenarios, and must feed category-wise consumption data upward each year; SLDC aggregates a state-level forecast for CEA, NLDC and RLDC (pp5–9).
Chapter 4 deals with generation resource planning: capacity crediting of contracted resources (with a detailed net-load method for wind and solar, and separate bases for hydro, thermal, storage and RE), assessment of a planning reserve margin against reliability indices, and identification of the resource gap from a 15-minute-or-longer resource map. It also routes the State's share in the national peak through CEA's LT-NRAP and NLDC's ST-NRAP (pp9–16).
Chapter 5 governs procurement: optimal resource mix, least-cost modelling, contract tenure, capacity sharing, prior Commission approval for new tie-ups and for PPA/PSA/Power Supply Agreement changes, and a window for emergency procurement without prior approval (pp16–19).
Chapters 6 to 7 impose compliance and a dense annual calendar of deadlines rolling from April data submission through May forecasts and capacity-credit factors, September filing with CEA, October filings with the Commission, and March contracting of any balance shortfall (pp19–23). Chapter 8 adds website disclosure, merit-order publication, mandatory planning and round-the-clock cells, consultation duties, and the Commission's powers to issue orders, relax, remove difficulties and amend (pp23–25). Annexure I details the modelling methodology and constraints; Annexure II lists 14 reporting formats (pp26–30).
Read with this
Procedures and orders made under it
Other copies of these documents (1)
- Dated 26 Feb 2026Framework for Resource Adequacy Regulation, 2026
Earlier drafts
- Dated 15 Nov 2025Framework for Resource Adequacy Regulations, 2025 — Draft
- Released with the draft dated 15 Nov 2025Public notice: Draft Framework for Resource Adequacy Regulations, 2025 — Public Notice
- Released with the draft dated 15 Nov 2025Annexure or form: Telangana Framework for Resource Adequacy Regulations, 2025 — Annexure-II (Formats 1 to 14) — Draft
Voltaic last read TSERC's website for final documents on 24 Nov 2026 and for drafts on 21 Nov 2026. A document TSERC issued after the page that lists it was read may not be held by Voltaic yet.
As of its reading of TSERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.