Skip to content

TSERC · Telangana State Electricity Regulatory Commission

Framework for Resource Adequacy Regulation, 2026 — Annexure-II (Formats 1 to 14)

Telangana Electricity Regulatory Commission (Framework for Resource Adequacy) Regulation, 2026 — ANNEXURE -II (Formats 1 to 14)

OrderDated 26 Feb 2026

Made under the Framework for Resource Adequacy Regulation, 2026.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on tgerc.telangana.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is Annexure-II to the Telangana Electricity Regulatory Commission (Framework for Resource Adequacy) Regulation, 2026: the blank reporting formats (Formats 1 to 14) through which the State's resource adequacy (RA) data is to be compiled and filed. It contains no operative obligations of its own — it is the template set that carries the regulation's information requirements (p1).

Formats 1 to 4 build the demand-and-supply picture. Format-1 (p1–5) is a discom-wise demand forecast summary that disaggregates energy sale in MUs across LT and HT consumer categories (including EV charging, RESCOs, railway traction and HMR) alongside distribution losses, intra-state and inter-state transmission losses, ex-bus requirement stated both restricted and unrestricted and both with and without open access, system load factor and peak load. Format-2 (p6–9) collects monthly ex-bus energy requirement, actuals for previous years plus projections over the ten-year horizon. Format-3 (p10–11) summarises power supply projections — requirement, availability including banking/power market, surplus/deficit and available generation capacity — and Format-4 (p12–13) does the same for peak supply, split morning/day/evening.

Formats 5 to 10 cover generation: existing/available capacity and availability in MW and MWh by source (State Gencos, State Hydels, Central Sector, IPPs, renewables source-wise and plant-wise) (p14); planned capacity and availability (p15); station-wise available/planned capacity with TG share and shortfalls (p16); additions (p17); station-wise additions with COD and TG share (p18); and a station-wise summary (p19).

Format-12 (p21–22) is the renewable purchase obligation plan, reconciling ex-bus energy requirement with RPO in MU and with existing and additional solar/non-solar capacity and energy. Formats 13 and 14 (p23–24) are ex-post review formats comparing approved plan figures against actuals and requiring reasons for deviation.

Standard name
Resource Adequacy Framework
Primary topics
Resource adequacy, Renewable purchase obligation (RPO / RCO), Losses and loss reduction

Read with this

The regulation

Other copies of these documents (1)

Earlier drafts

Voltaic last read TSERC's website for final documents on 24 Nov 2026 and for drafts on 21 Nov 2026. A document TSERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on tgerc.telangana.gov.in ↗

Report an issue with this document