Framework for Resource Adequacy Regulation, 2026 — Annexure-II (Formats 1 to 14)
Telangana Electricity Regulatory Commission (Framework for Resource Adequacy) Regulation, 2026 — ANNEXURE -II (Formats 1 to 14)
OrderDated 26 Feb 2026
Made under the Framework for Resource Adequacy Regulation, 2026.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is Annexure-II to the Telangana Electricity Regulatory Commission (Framework for Resource Adequacy) Regulation, 2026: the blank reporting formats (Formats 1 to 14) through which the State's resource adequacy (RA) data is to be compiled and filed. It contains no operative obligations of its own — it is the template set that carries the regulation's information requirements (p1).
Formats 1 to 4 build the demand-and-supply picture. Format-1 (p1–5) is a discom-wise demand forecast summary that disaggregates energy sale in MUs across LT and HT consumer categories (including EV charging, RESCOs, railway traction and HMR) alongside distribution losses, intra-state and inter-state transmission losses, ex-bus requirement stated both restricted and unrestricted and both with and without open access, system load factor and peak load. Format-2 (p6–9) collects monthly ex-bus energy requirement, actuals for previous years plus projections over the ten-year horizon. Format-3 (p10–11) summarises power supply projections — requirement, availability including banking/power market, surplus/deficit and available generation capacity — and Format-4 (p12–13) does the same for peak supply, split morning/day/evening.
Formats 5 to 10 cover generation: existing/available capacity and availability in MW and MWh by source (State Gencos, State Hydels, Central Sector, IPPs, renewables source-wise and plant-wise) (p14); planned capacity and availability (p15); station-wise available/planned capacity with TG share and shortfalls (p16); additions (p17); station-wise additions with COD and TG share (p18); and a station-wise summary (p19).
Format-12 (p21–22) is the renewable purchase obligation plan, reconciling ex-bus energy requirement with RPO in MU and with existing and additional solar/non-solar capacity and energy. Formats 13 and 14 (p23–24) are ex-post review formats comparing approved plan figures against actuals and requiring reasons for deviation.
Read with this
The regulation
- Dated 24 Feb 2026Framework for Resource Adequacy Regulation, 2026
Other copies of these documents (1)
- Dated 26 Feb 2026Framework for Resource Adequacy Regulation, 2026
Earlier drafts
- Dated 15 Nov 2025Framework for Resource Adequacy Regulations, 2025 — Draft
- Released with the draft dated 15 Nov 2025Public notice: Draft Framework for Resource Adequacy Regulations, 2025 — Public Notice
- Released with the draft dated 15 Nov 2025Annexure or form: Telangana Framework for Resource Adequacy Regulations, 2025 — Annexure-II (Formats 1 to 14) — Draft
Voltaic last read TSERC's website for final documents on 24 Nov 2026 and for drafts on 21 Nov 2026. A document TSERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.