Telangana Framework for Resource Adequacy Regulations, 2025 — Annexure-II (Formats 1 to 14) — Draft

Draft Telangana Electricity Regulatory Commission (Framework for Resource Adequacy) Regulations, 2025. ANNEXURE -II (Formats 1 to 14)

Annexure or form of a draftReleased with the draft dated 15 Nov 2025

Draft

The draft has since been finalised as the Framework for Resource Adequacy Regulation, 2026.

Annexure or form of the Framework for Resource Adequacy Regulations, 2025 — Draft.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on tgerc.telangana.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This document is Annexure-II to the Draft Telangana Electricity Regulatory Commission (Framework for Resource Adequacy) Regulations, 2025 (p1). It is not the operative regulation text; it supplies the standard forms that DISCOMs and state-level resource-adequacy planners are expected to use. Every format is a blank table with year columns for Year-1 to Year-10, and several add monthly columns or previous-year actuals.

Format-1 (pp1–5) is a discom-wise and state-level demand forecast summary covering consumer-category energy sales, total sales, growth, distribution and transmission losses, ex-bus requirement, load factor and peak load. Format-2 (pp6–9) is the monthly ex-bus energy requirement format, separating previous actuals from projections. Format-3 (pp10–11) sets the ten-year power supply projection summary — energy requirement, availability including banking/power market, surplus or deficit, and available generation capacity. Format-4 (pp12–13) does the same for peak supply, including morning/day/evening availability and wind generation. Format-5 (p14) covers existing/available generation capacity and availability by ownership and renewable source; Format-6 (p15) does this for planned capacity. Formats 7–10 (pp16, 18–19) require generating-station-wise detail: available and planned capacity, additions, commercial operation date, TG share, shortfalls and energy availability for long-, medium- and short-term projects. Format-12 (pp21–22) is the renewable power obligation plan, split into solar and non-solar capacity and energy. Formats 13–14 (pp23–24) are variance reports comparing approved plan with actual demand forecast and energy availability, including reasons for deviation.

The formats are templates only; they do not themselves set obligations, thresholds, timelines or an in-force date.

Standard name
Resource Adequacy Framework
Primary topics
Resource adequacy, Renewable purchase obligation (RPO / RCO)

Read with this

The regulation

Procedures and orders made under it

Other copies of these documents (1)

Earlier drafts

Voltaic last read TSERC's website for final documents on 24 Nov 2026 and for drafts on 21 Nov 2026. A document TSERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on tgerc.telangana.gov.in ↗

Report an issue with this document