TSERC · Telangana State Electricity Regulatory Commission
Telangana Framework for Resource Adequacy Regulations, 2025 — Annexure-II (Formats 1 to 14) — Draft
Draft Telangana Electricity Regulatory Commission (Framework for Resource Adequacy) Regulations, 2025. ANNEXURE -II (Formats 1 to 14)
Annexure or form of a draftReleased with the draft dated 15 Nov 2025
Draft
The draft has since been finalised as the Framework for Resource Adequacy Regulation, 2026.
Annexure or form of the Framework for Resource Adequacy Regulations, 2025 — Draft.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This document is Annexure-II to the Draft Telangana Electricity Regulatory Commission (Framework for Resource Adequacy) Regulations, 2025 (p1). It is not the operative regulation text; it supplies the standard forms that DISCOMs and state-level resource-adequacy planners are expected to use. Every format is a blank table with year columns for Year-1 to Year-10, and several add monthly columns or previous-year actuals.
Format-1 (pp1–5) is a discom-wise and state-level demand forecast summary covering consumer-category energy sales, total sales, growth, distribution and transmission losses, ex-bus requirement, load factor and peak load. Format-2 (pp6–9) is the monthly ex-bus energy requirement format, separating previous actuals from projections. Format-3 (pp10–11) sets the ten-year power supply projection summary — energy requirement, availability including banking/power market, surplus or deficit, and available generation capacity. Format-4 (pp12–13) does the same for peak supply, including morning/day/evening availability and wind generation. Format-5 (p14) covers existing/available generation capacity and availability by ownership and renewable source; Format-6 (p15) does this for planned capacity. Formats 7–10 (pp16, 18–19) require generating-station-wise detail: available and planned capacity, additions, commercial operation date, TG share, shortfalls and energy availability for long-, medium- and short-term projects. Format-12 (pp21–22) is the renewable power obligation plan, split into solar and non-solar capacity and energy. Formats 13–14 (pp23–24) are variance reports comparing approved plan with actual demand forecast and energy availability, including reasons for deviation.
The formats are templates only; they do not themselves set obligations, thresholds, timelines or an in-force date.
Read with this
The regulation
- Dated 24 Feb 2026Framework for Resource Adequacy Regulation, 2026
Procedures and orders made under it
Other copies of these documents (1)
- Dated 26 Feb 2026Framework for Resource Adequacy Regulation, 2026
Earlier drafts
- Dated 15 Nov 2025Framework for Resource Adequacy Regulations, 2025 — Draft
- Released with the draft dated 15 Nov 2025Public notice: Draft Framework for Resource Adequacy Regulations, 2025 — Public Notice
Voltaic last read TSERC's website for final documents on 24 Nov 2026 and for drafts on 21 Nov 2026. A document TSERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.