Skip to content

TSERC · Telangana State Electricity Regulatory Commission

Framework for Resource Adequacy Regulations, 2025 — Draft

Telangana Electricity Regulatory Commission (Framework for Resource Adequacy) Regulations, 2025

Draft regulationDated 15 Nov 2025

Draft

A proposal that has since been finalised as the Framework for Resource Adequacy Regulation, 2026.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on tgerc.telangana.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a draft notification by the Telangana Electricity Regulatory Commission of a principal regulation to establish a resource adequacy framework for the State. It is dated 15 November 2025 and would come into force on publication in the Telangana Gazette; the Gazette date is not printed (p1, p23). The regulation applies to generating companies, distribution licensees, the State Load Despatch Centre, transmission companies and other grid-connected entities in Telangana (p1, p3).

Chapter 1 sets the title, extent, commencement, objective, scope and definitions (p1–4). Chapter 2 describes resource adequacy as a four-step cycle—demand assessment and forecasting, generation resource planning, procurement planning, and monitoring and compliance—conducted over a ten-year planning period on an annual rolling basis (p4–5).

Chapter 3 prescribes demand assessment and forecasting. Distribution licensees must prepare long-, medium- and short-term forecasts using CEA guidelines and specified statistical or modelling methods, test at least three scenarios, adjust for policies and demand drivers, and aggregate forecasts through the STU and SLDC for submission to CEA, NLDC and RLDC (p5–9).

Chapter 4 deals with generation resource planning. It sets out data requirements, a net-load-based capacity credit methodology for renewable resources, separate approaches for hydro and thermal capacity credits, planning reserve margin assessment using reliability indices, and the calculation and allocation of resource adequacy requirements. It links state planning to CEA's long-term national plan and NLDC's short-term national plan, and assigns preparation of long-term and short-term distribution resource adequacy plans (p9–15).

Chapter 5 covers procurement planning: optimal resource mix and least-cost modelling, contract tenure and regional preference, capacity sharing, prior Commission approval for new PPAs and amendments, and limited emergency procurement without prior approval subject to later reporting (p15–18). Chapter 6 provides for monitoring and compliance, including non-compliance charges (p18). Chapter 7 allocates data-sharing duties and sets an annual timeline running from April data submissions through national plan publication, state allocation, CEA validation, Commission approval and balance contracting (p18–21). Chapter 8 covers website disclosures, dedicated planning and real-time procurement cells, consultation, and the Commission's powers to issue directions, relax provisions, remove difficulties and amend the regulations, plus savings clauses (p21–23). Annexure-I provides the modelling methodology and constraints for preparing a resource adequacy plan (p24–26); Annexure-II is a placeholder for 14 formats (p27).

Standard name
Resource Adequacy Framework
Primary topics
Resource adequacy, Power procurement and PPAs, Energy storage deployment

Read with this

The regulation

Procedures and orders made under it

Other copies of these documents (1)

Earlier drafts

Voltaic last read TSERC's website for final documents on 24 Nov 2026 and for drafts on 21 Nov 2026. A document TSERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on tgerc.telangana.gov.in ↗

Report an issue with this document