PSERC · Punjab State Electricity Regulatory Commission

Generation Formats (G1–G16)

Formats (Generation) - PDF

OrderDate not stated

Replaced by Terms and Conditions for Determination of Generation, Transmission, Wheeling and Retail Supply Tariff Regulations, 2019

See that regulation for the date it took effect and for anything it keeps in force.

Made under the Generation, Transmission, Wheeling and Retail Supply Tariff Regulations, 2014.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on pserc.punjab.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a set of blank petition formats, numbered G1–G16, for a generating company or generation business to report costs and revenue to an electricity regulatory Commission. It contains no substantive tariff rules, only tables and notes telling a filer what data to furnish and which other form to cross-reference (p1–p4).

A first group builds the financial statements: a Profit & Loss Account (p2), Annual Revenue Requirement (p3), and Summary of Generation Cost (p4), all projected over the previous year, current year and three control-period years and cross-referencing C-series forms. A second group captures plant and hydro technical data: Plant Characteristics (Thermal) (p5), Salient Features of Hydroelectric Project (p6), and monthly Design Energy and Peaking Capability for ROR/pondage/storage stations (p7).

Normative parameters for thermal stations (p8) and for hydro stations — COD, station type, NAPAF, etc. (p9) — are followed by a Maintenance Schedule of Thermal Power Stations with rows for GNDTP, GGSSTP and GHTP for PSPCL (p10). Operating and fuel reporting follows: Generation Details: Fuel and Variable Charges, with notes on historical and unit-wise data (p11); Repair & Maintenance Expenditure (p12); Working Capital Requirements (p13), with interest rate tied to Regulation 34.2; and quarterly Detailed Information Regarding Fuel for Computation of Energy Charges (p14).

Later forms cover income from investments and non-tariff income (p16), existing and proposed tariff schedules (p17), and revenue from sale of power at existing tariffs (Forms G15, pp18–19) and proposed tariffs (Form G16, p20). A note at p1 says formats may be amended or added to. The document states no effective date, issuer or number.

Primary topics
Generation tariff, ARR and true-up, Operating costs and other income

Read with this

Procedures and orders made under it

4 more documents belong here and are not on Voltaic: 4 procedures or orders made under it not held as English text.

Voltaic last read PSERC's website for final documents on 26 Nov 2026. A document PSERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on pserc.punjab.gov.in ↗

Report an issue with this document