PSERC · Punjab State Electricity Regulatory Commission
Generation, Transmission, Wheeling and Retail Supply Tariff Regulations, 2014
Punjab State Electricity Regulatory Commission (Terms and Conditions for Determination of Generation, Transmission, Wheeling and Retail Supply Tariff) Regulations, 2014
RegulationDated 1 Jul 2014No. PSERC/Secy/Regu -94 dated July 01, 2014
See that regulation for the date it took effect and for anything it keeps in force.
Summary
Summary written by software, from pages 1 to 30 of 48. Check the regulator's original before you rely on it.
This is the Punjab State Electricity Regulatory Commission's principal tariff regulation for its first multi-year control period, issued on 1 July 2014 under sections 181(2), 61 and 62 of the Electricity Act 2003 (p1). It applies across Punjab and governs Commission determinations for generation tariffs, supply by generating companies to distribution licensees, intra-state transmission to open access customers, SLDC fees, wheeling and retail supply, and cross-subsidy/additional surcharge under the Open Access Regulations (p1). Part I (pp1–8) sets commencement and scope, then defines terms from ARR, control period and cut-off date to availability, PLF, terminal liabilities and open access customers, with residual meanings drawn from the Act, Grid Code and Supply Code. Part II (pp9–19) establishes the MYT framework: separate accounts and ARRs for generation, transmission, SLDC, wheeling and retail supply; allocation statements until accounts are segregated; baseline values and classification of controllable, normative and uncontrollable items; capital investment and business plan approvals; annual performance review; true-up; and end-of-control-period review. Part III (pp19–21) sets out the building blocks of generation tariff, transmission and SLDC charges, and distribution wheeling and retail supply tariffs. Part IV (pp21–30) lays down common principles for capital cost, additional capitalization, debt-equity ratio, return on equity, depreciation, foreign exchange variation, income tax, interest on loan and working capital, O&M expenses, prior period expenses and non-tariff income. Later parts are not available. Commencement depends on a date to be notified by the Commission, and the control period duration is to be notified separately (p1, p3–4, p11).
Read with this
Amendments and corrections
- Dated 3 Feb 2016Terms and Conditions for Determination of Generation, Transmission, Wheeling and Retail Supply Tariff Regulations, 2014 — First Amendment, 2016
- Dated 8 Aug 2018Terms and Conditions for Determination of Generation, Transmission, Wheeling and Retail Supply Tariff Regulations, 2014 — 2nd Amendment, 2018
Procedures and orders made under it
- Dated 28 May 2015Effective Date for Enforcement of the Tariff Regulations, 2014 — Notification
- Date not statedGeneration Formats (G1–G16)
- Date not statedTransmission & SLDC Formats
- Date not statedFormats (Common for Generation, Transmission & Distribution)
- Date not statedDistribution Formats
4 more documents belong here and are not on Voltaic: 4 procedures or orders made under it not held as English text.
Voltaic last read PSERC's website for final documents on 26 Nov 2026. A document PSERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.