Skip to content

PSERC · Punjab State Electricity Regulatory Commission

Terms and Conditions for Determination of Generation, Transmission, Wheeling and Retail Supply Tariff Regulations, 2014 — 2nd Amendment, 2018

Punjab State Electricity Regulatory Commission (Terms and Conditions for Determination of Generation, Transmission, Wheeling and Retail Supply Tariff) (2nd Amendment) Regulations, 2018

AmendmentDated 8 Aug 2018In force from 1 Oct 2018No. PSERC/Secy/Regu.-129 dated The 8 th August, 2018

Replaced by Terms and Conditions for Determination of Generation, Transmission, Wheeling and Retail Supply Tariff Regulations, 2019

See that regulation for the date it took effect and for anything it keeps in force.

Amends the Generation, Transmission, Wheeling and Retail Supply Tariff Regulations, 2014.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on pserc.punjab.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a two-page PSERC notification that amends the Commission's 2014 tariff determination regulations in five places; the text itself calls it the second such amendment. It is issued on 8 August 2018 but takes effect only from 1 October 2018 (p1), so the changes are not retrospective.

The first operative change substitutes clause 12.5 on true-up, providing that where approved amounts change during the true-up exercise the Commission will consider the approved carrying cost as a separate item of expense rather than absorbing it in other heads (p1). The next adds a further proviso to clause 21.1 on depreciation, requiring government grants and consumer contribution to be recognised as defined under Indian Accounting Standard 20 notified by the Ministry of Corporate Affairs (p1) — importing a central accounting standard into the state's tariff computation.

Clause 28.1 on non-tariff income is rewritten in two sub-clauses: late payment surcharge is recast as net revenue (surcharge less its financing cost), and the residual catch-all covers income not listed elsewhere, with a proviso that only part of the rebate received for timely payment of power purchase counts as non-tariff income (p1–2).

Regulation 31.2 is substituted to prescribe when late payment surcharge is triggered on a beneficiary's delayed payment of a bill and by whom it is levied (p2). Regulation 40 is replaced in full: landed cost of fuel is now fixed by reference to the corresponding provision of the CERC Tariff Regulations, 2014 as amended from time to time, with a proviso barring transit and handling losses for coal priced on FOR-destination basis (p2).

The practical significance is that PSERC outsources two key inputs — the fuel-cost basis to CERC and grant/contribution accounting to IND AS 20 — so those definitions move without further state amendment. No repeal, savings or transitional clause appears, and no Gazette date is printed.

Standard name
Tariff Regulations
Primary topics
Tariff determination, ARR and true-up, Fuel and power purchase cost adjustment

Read with this

Procedures and orders made under it

4 more documents belong here and are not on Voltaic: 4 procedures or orders made under it not held as English text.

Voltaic last read PSERC's website for final documents on 26 Nov 2026. A document PSERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on pserc.punjab.gov.in ↗

Report an issue with this document