PSERC · Punjab State Electricity Regulatory Commission
Transmission & SLDC Formats
Formats (Transmission & SLDC) - PDF
OrderDate not stated
See that regulation for the date it took effect and for anything it keeps in force.
Made under the Generation, Transmission, Wheeling and Retail Supply Tariff Regulations, 2014.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This document is a set of filing formats for a transmission licensee/STU and SLDC in the PSERC jurisdiction, built around a three-year control period. The index on p1 lists forms T1–T25(B), covering financial statements, technical characteristics, revenue, demand, losses, metering and outage data, and instructs that an electronic Word copy and Excel calculation be submitted. Formats may be amended or added (p1).
The financial core starts with the Profit & Loss Account for Transmission Business (p2) and SLDC Business (p3), cross-referencing other form numbers. Annual Revenue Requirement formats follow for Transmission (p4) and SLDC (p5). Both note that, until transmission and SLDC activities are segregated, computation must follow an allocation statement that separates their costs (p3, p5). The Key Characteristics of the Transmission Utility formats capture network size, transformation capacity, losses, availability, metering and employee strength across previous, current and control-period years (pp6–8). Normative parameters include return on equity, target availability, O&M working-capital norms, spares, receivables and interest rate, with a footnote pointing to PSERC Tariff Regulations Reg. 54.2 for the working-capital interest rate (pp9, 23).
Then the pack moves through source-wise transmission capacity and PSPCL shares (pp10–11), energy balance at the transmission interfaces (p12), revenue from intrastate wheeling and other charges by user category (pp13–16), and projection of energy sales, connected load and peak/off-peak demand (pp17–20). Separate R&M expense formats are provided for transmission and SLDC business (pp21–22), followed by working capital, non-tariff income, and contributions/grants/subsidies (pp23–25).
Tariff and performance reporting includes existing and proposed tariff schedules and revenue from current and proposed tariffs (pp26–28), voltage-wise transmission losses (pp29–32), metering status (pp33–35), voltage profile (p36), outages and transformer failures (pp37–38), and peak demand formats including month-wise peak and off-peak demand (pp39–41). The document itself sets no substantive tariff values, dates or eligibility thresholds; it is a template instrument for petition preparation.
Read with this
The regulation
Amendments and corrections
- Dated 3 Feb 2016Terms and Conditions for Determination of Generation, Transmission, Wheeling and Retail Supply Tariff Regulations, 2014 — First Amendment, 2016
- Dated 8 Aug 2018Terms and Conditions for Determination of Generation, Transmission, Wheeling and Retail Supply Tariff Regulations, 2014 — 2nd Amendment, 2018
Procedures and orders made under it
- Dated 28 May 2015Effective Date for Enforcement of the Tariff Regulations, 2014 — Notification
- Date not statedGeneration Formats (G1–G16)
- Date not statedFormats (Common for Generation, Transmission & Distribution)
- Date not statedDistribution Formats
4 more documents belong here and are not on Voltaic: 4 procedures or orders made under it not held as English text.
Voltaic last read PSERC's website for final documents on 26 Nov 2026. A document PSERC issued after the page that lists it was read may not be held by Voltaic yet.