Skip to content

MERC · Maharashtra Electricity Regulatory Commission

Renewable Energy Tariff Regulations, 2015 — First Amendment, 2016 — Explanatory Memorandum — Draft

Draft MERC (Terms and Conditions for Determination of Renewable Energy Tariff) (First Amendment) Regulations, 2016

Explanatory memorandum to a draftDate not stated

Draft

The draft has since been finalised as the Renewable Energy Tariff Regulations, 2015 — First Amendment, 2017.

Explanatory memorandum to a draft that is not on Voltaic.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on merc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This document is the Maharashtra Electricity Regulatory Commission's explanatory memorandum accompanying its Draft MERC (Terms and Conditions for Determination of Renewable Energy Tariff) (First Amendment) Regulations, 2016. It explains why the Commission proposes to amend the proviso to Regulation 46.2 of the 2015 RE Tariff Regulations and reproduces the proposed text. It is not the notified amendment itself.

The background recalls that under the 2010 RE Tariff Regulations, non-compliance with fossil fuel usage restrictions by biomass power projects (Regulation 43.2) and non-fossil fuel-based co-generation projects (Regulation 59.2) made the project ineligible for preferential tariff from the date of default and during the default period; it still had to sell to the distribution licensee but at a rate lower by Re 0.50/kWh than the preferential tariff (p1). Under the 2015 RE Tariff Regulations, which the document states are applicable at present, the default-period sale rate became the APPC rate of the relevant distribution licensee, and Regulation 64 applies Regulations 46 and 47 to non-fossil fuel-based co-generation projects mutatis mutandis (pp1–2).

The Commission's reasons section records that the Maha Co-Gen Green Power Producers Association petitioned to restore the earlier reduction. In its Order dated 16 August 2016 in Case No. 29 of 2016, the Commission found a prima facie case for amending Regulation 46.2 to restore the 50 paise/kWh reduction and said it would separately initiate the amendment process (p2). The memorandum sets out the Commission's reasoning that applying APPC ab initio to non-qualifying plants differs from applying it to qualifying plants during default; that the earlier provision had stood the test of time and balanced fossil-fuel restrictions against procurement exigencies; that it was not intended to force plants to close; and that it allowed variable and part fixed costs to be covered during default. It also notes the Association's point about MSEDCL's Renewable Purchase Obligation and the contention that biomass and bagasse availability fell 30 to 35% over the last two years (pp2–3).

The final section reproduces the proposed substituted proviso to Regulation 46.2, under which a defaulting biomass-based project continues to sell power to the Distribution Licensee during the default period at a rate lower by Re 0.50/kWh than the applicable preferential tariff determined for the relevant year (p3). No commencement date, final notification number or savings clause is stated.

Standard name
Renewable Energy Tariff Regulations
Primary topics
Renewable energy tariff

Read with this

The regulation

Amendments and corrections

Earlier drafts

7 more documents belong here and are not on Voltaic: 3 drafts or notices on a draft not held as English text, 2 copies in another language, 1 amendment not held as English text and 1 draft or notice on a draft.

Voltaic last read MERC's website for final documents on 24 Nov 2026 (8 pages) and for drafts on 24 Nov 2026. A document MERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on merc.gov.in ↗

Report an issue with this document