MERC · Maharashtra Electricity Regulatory Commission
Renewable Energy Tariff Regulations, 2015 — Draft
Maharashtra Electricity Regulatory Commission (Terms and Conditions for Determination of Renewable Energy Tariff) Regulations, 2015
Draft regulationReleased with the notice dated 24 Jul 2015No. MERC/Legal/______/______/ dated ____July, 2015
Draft
A proposal that has since been finalised as the Renewable Energy Tariff Regulations, 2015.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is a draft MERC regulation that would set the terms and conditions for determining tariffs for renewable energy projects in Maharashtra. It is aimed at new RE projects commissioned in the State after notification that sell electricity to distribution licensees and whose tariff MERC determines under the Electricity Act; existing projects are left to RE tariff orders, and projects opting for RECs are routed to the RPO/REC framework (p7). It defines eligible project classes — wind, small/mini/micro hydro, biomass, non-fossil co-generation, solar PV/thermal/rooftop, municipal solid waste, hybrid and gasifier/biogas — with size and fuel conditions for hydro, biomass and co-generation (p3–4).
Chapter 1 lays down general principles: competitive-bidding adoption, a five-year review period, technology-specific tariff periods, project-specific tariff routes, petition requirements, single-part/two-part tariff structure, levelisation and must-run despatch (p8–11). Chapter 2 sets the financial principles — capital cost, debt-equity, loans, depreciation, return on equity, working capital, O&M, rebate, late payment, CDM sharing, reactive energy, subsidies and taxes (p11–14).
Chapters 3 to 8 provide technology-specific parameters for wind, small hydro, biomass, non-fossil co-generation, solar PV and solar thermal: capital cost and indexation, CUF/PLF, auxiliary consumption, station heat rate, O&M and fuel cost/indexation, plus fuel-mix and fossil-fuel compliance and audit/monitoring for biomass and co-generation (p14–25). Chapter 9 contains miscellaneous powers: deviation from norms, relaxation, orders and practice directions, amendment and removal of difficulties (p25–26).
Annexure-A contains parameter-assumption and tariff-computation forms; Annexure-B contains monthly fuel usage and procurement cost templates for biomass and co-generation projects (p27–32, p34). The draft is dated blank July 2015 and is to come into force on Gazette publication (p2, p26).
Read with this
The regulation
- Dated 10 Nov 2015Renewable Energy Tariff Regulations, 2015
Amendments and corrections
Earlier drafts
- Released with the notice dated 2 Dec 2016Terms and Conditions for Determination of Renewable Energy Tariff (First Amendment) Regulations, 2016 — Draft
- Dated 2 Dec 2016Public notice: Draft Renewable Energy Tariff (First Amendment) Regulations, 2016 — Public Notice
- Date not statedRenewable Energy Tariff Regulations, 2015 — First Amendment, 2016 — Explanatory Memorandum — Draft
- Released with the notice dated 24 Jul 2015File: Approach Paper for RE Tariff Regulations, 2015 — FY 2015-16 Review Period
- Dated 24 Jul 2015Public notice: Draft Renewable Energy Tariff Regulations, 2015 — Public Notice Inviting Comments
7 more documents belong here and are not on Voltaic: 3 drafts or notices on a draft not held as English text, 2 copies in another language, 1 amendment not held as English text and 1 draft or notice on a draft.
Voltaic last read MERC's website for final documents on 24 Nov 2026 (8 pages) and for drafts on 24 Nov 2026. A document MERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.