MERC · Maharashtra Electricity Regulatory Commission
Approach Paper for RE Tariff Regulations, 2015 — FY 2015-16 Review Period
Approach Paper for MERC (Terms and Conditions for determination of Renewable Energy Tariff) Regulations, 2015 for Review Period starting from FY 2015-16
Published with a draftReleased with the notice dated 24 Jul 2015
Draft
The draft has since been finalised as the Renewable Energy Tariff Regulations, 2015.
Published with the Renewable Energy Tariff Regulations, 2015 — Draft.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is MERC’s approach paper, prepared by IMaCS in July 2015, for the next revision of its renewable energy tariff regulations. It is a consultation and rationale document, not the notified regulation: it sets out proposed scope, principles, financial norms and technology-wise parameters for the review period beginning FY 2015-16, drawing on stakeholder comments, other SERCs/CERC practice and limited project data (p1, p7–12, p16).
The opening sections explain why MERC is revising the 2010 RE tariff regulations, list proposed eligibility categories (wind, small/mini/micro hydro, biomass, non-fossil cogeneration, solar PV/thermal, municipal waste, hybrid and gasifier/biogas projects), and propose general principles: a five-year review period, technology-specific tariff periods, project-specific tariff for listed categories, levelised single-part tariffs (two-part for fuel-based technologies), petition requirements, must-run treatment and data reporting (p13–20).
The financial-principles chapter proposes the capital structure, return on equity, cost and tenure of debt, depreciation, working capital interest, discount rate, treatment of taxes/duties, subsidies and incentives, rebate, late-payment surcharge, CDM benefit sharing and reactive-energy charges (p21–41). For each technology, later chapters propose normative capital cost, CUF/PLF, O&M, auxiliary consumption and, for biomass and cogeneration, fuel cost, GCV and station heat rate; the reasoning is supported by comparative SERC tables, indexation workings and stakeholder comments (wind pp42–56; small hydro pp57–63; biomass pp65–83; cogeneration pp84–97; solar PV pp99–105; solar thermal pp106–110). The final chapter recommends adopting competitive bidding under section 63 once central guidelines are notified (pp110–111). The paper repeatedly flags weak data and proposes reviews or studies before some norms are finalised.
Read with this
The regulation
- Dated 10 Nov 2015Renewable Energy Tariff Regulations, 2015
Amendments and corrections
Earlier drafts
- Released with the notice dated 24 Jul 2015Renewable Energy Tariff Regulations, 2015 — Draft
- Dated 24 Jul 2015Public notice: Draft Renewable Energy Tariff Regulations, 2015 — Public Notice Inviting Comments
- Released with the notice dated 2 Dec 2016Terms and Conditions for Determination of Renewable Energy Tariff (First Amendment) Regulations, 2016 — Draft
- Dated 2 Dec 2016Public notice: Draft Renewable Energy Tariff (First Amendment) Regulations, 2016 — Public Notice
- Date not statedRenewable Energy Tariff Regulations, 2015 — First Amendment, 2016 — Explanatory Memorandum — Draft
7 more documents belong here and are not on Voltaic: 3 drafts or notices on a draft not held as English text, 2 copies in another language, 1 amendment not held as English text and 1 draft or notice on a draft.
Voltaic last read MERC's website for final documents on 24 Nov 2026 (8 pages) and for drafts on 24 Nov 2026. A document MERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.