MERC · Maharashtra Electricity Regulatory Commission
Draft Renewable Energy Tariff (First Amendment) Regulations, 2016 — Public Notice
Inviting Comments on Draft Maharashtra Electricity Regulatory Commission (Terms and Conditions for Determination of Renewable Energy Tariff) (First Amendment) Regulations, 2016
Public notice on a draftDated 2 Dec 2016Advertisement No. _/2016 dated 2 December, 2016
Draft
The draft has since been finalised as the Renewable Energy Tariff Regulations, 2015 — First Amendment, 2017.
Public notice on the Terms and Conditions for Determination of Renewable Energy Tariff (First Amendment) Regulations, 2016 — Draft.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is a one-page public notice by which the Maharashtra Electricity Regulatory Commission announces that it has prepared a draft First Amendment to its Terms and Conditions for Determination of Renewable Energy Tariff Regulations, 2016, and invites public comment on it (p1).
The notice states the single point of substance: the draft would change the provision in the principal Regulations governing the rate payable to biomass-based and non-fossil fuel-based co-generation projects when those projects default on the fuel use conditions attached to them (p1). It does not set out the proposed wording or the revised rate; the draft Regulations and an accompanying Explanatory Memorandum are said to be available for download on the Commission's two websites (p1).
The rest of the notice is the consultation procedure: comments, suggestions and objections are to go to the Secretary, MERC, in 6 (1+5) copies, by hand, post, fax or e-mail, and only those received on or before 26 December 2016 will be considered before the draft is finalised (p1). It is signed by the Secretary and dated Mumbai, 2 December 2016 (p1). For an analyst, this is a pointer document — a consultation window, not the operative amendment.
Read with this
The regulation
- Dated 10 Nov 2015Renewable Energy Tariff Regulations, 2015
Amendments and corrections
Earlier drafts
- Released with the notice dated 24 Jul 2015Renewable Energy Tariff Regulations, 2015 — Draft
- Released with the notice dated 24 Jul 2015File: Approach Paper for RE Tariff Regulations, 2015 — FY 2015-16 Review Period
- Dated 24 Jul 2015Public notice: Draft Renewable Energy Tariff Regulations, 2015 — Public Notice Inviting Comments
- Released with the notice dated 2 Dec 2016Terms and Conditions for Determination of Renewable Energy Tariff (First Amendment) Regulations, 2016 — Draft
- Date not statedRenewable Energy Tariff Regulations, 2015 — First Amendment, 2016 — Explanatory Memorandum — Draft
7 more documents belong here and are not on Voltaic: 3 drafts or notices on a draft not held as English text, 2 copies in another language, 1 amendment not held as English text and 1 draft or notice on a draft.
Voltaic last read MERC's website for final documents on 24 Nov 2026 (8 pages) and for drafts on 24 Nov 2026. A document MERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.