CERC · Central Electricity Regulatory Commission
RE Tariff Regulations, 2009 — First Amendment, 2010 — Statement of Objects and Reasons
Statement of Objects and Reasons
Statement of reasonsDated 27 Apr 2010No.L-7/186(201)/2009-CERC dated 27.4.2010
Replaced by Terms and Conditions for Tariff Determination from Renewable Energy Sources Regulations, 2012
See that regulation for the date it took effect and for anything it keeps in force.
The commission's reasons for the Renewable Energy Tariff Regulations, 2009 or one of its amendments.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is the Central Electricity Regulatory Commission's Statement of Objects and Reasons, dated 27 April 2010, for the First Amendment to the CERC (Terms and Conditions for Tariff determination from Renewable Energy Sources) Regulations, 2010. It is an explanatory record of the Commission's reasoning and the stakeholder consultation, not the operative amendment text.
The Introduction (pp1–2) sets out the Commission's legal mandate under the Electricity Act, 2003, including Section 79 functions, Section 61 tariff powers and Section 178(2)(s) regulation-making power with previous publication under Section 178(3). It records the chronology: the original RE Tariff Regulations were notified on 16 September 2009; a draft First Amendment was published on 19 January 2010 for comments; a public hearing was held on 10 February 2010; and the First Amendment was notified on 25 February 2010.
The central discussion (pp2–4) concerns tariff visibility for solar projects. Stakeholders asked for longer control periods for Solar PV and Solar Thermal projects, several linking solar commissioning to the evolving Jawaharlal Nehru National Solar Mission (JNNSM) framework and MNRE draft Phase-I guidelines. The Commission decided that the generic tariff and norms for Solar PV for 2010-11 would also apply to Solar PV projects commissioned during 2011-12, and that the Solar Thermal generic tariff for 2010-11 would also apply to Solar Thermal projects commissioned during 2011-12 and 2012-13. These extensions are conditional: PPAs must be signed on or before 31 March 2011, and the entire capacity must be commissioned by 31 March 2012 for Solar PV and by 31 March 2013 for Solar Thermal (p4).
On zone-wise CUF and solar module degradation (pp4–5), the Commission declines to make changes in this process, citing the absence of a scientific solar radiation atlas and referring to its detailed ruling in the order dated 25 February 2010 in Petition No. 13/2010 (Suo-Motu). The annexure (pp6–8) summarises stakeholder comments on applicability of tariff, module degradation, and global solar insolation/CUF.
Read with this
The regulation
- Dated 16 Sep 2009Renewable Energy Tariff Regulations, 2009
Amendments and corrections
- Dated 25 Feb 2010Renewable Energy Tariff Regulations, 2009 — First Amendment, 2010
Commencement notices and reasons
- Dated 7 Oct 2009RE Tariff Regulations, 2009 — Statement of Objects and Reasons
Procedures and orders made under it
Other copies of these documents (1)
- Dated 25 Feb 2010RE Tariff Regulations, 2009 — First Amendment, 2010
Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.