Skip to content

CERC · Central Electricity Regulatory Commission

Renewable Energy Tariff Regulations, 2009

Central Electricity Regulatory Commission (Terms and Conditions for Tariff determination from Renewable Energy Sources) Regulations, 2009

RegulationDated 16 Sep 2009No.L-7/186(201)/2009-CERC dated 16th September, 2009

Replaced by Terms and Conditions for Tariff Determination from Renewable Energy Sources Regulations, 2012

See that regulation for the date it took effect and for anything it keeps in force.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is CERC's principal tariff regulation for renewable energy, issued 16 September 2009 under s.61 read with s.178(2)(s) of the Electricity Act, 2003, and brought into force from the date of publication in the Official Gazette (the Gazette date is not printed) (p1). It applies wherever CERC determines the tariff of a renewable generating station or unit under s.62 read with s.79 (p5), and it puts each technology through an eligibility test before the norms apply (p6–7): wind sites meeting a minimum annual mean wind power density at 50 m hub height, small hydro up to 25 MW at a single location with State Nodal Agency site approval, Rankine-cycle biomass with fossil fuel capped at 15% of annual fuel consumption, topping-cycle non-fossil cogeneration meeting the qualifying output test, and MNRE-approved solar PV and solar thermal technologies.

Regulations 1–4 give the title, commencement, definitions and scope. Chapter 1 (pp8–12) sets the general principles: a three-year control period whose first year runs from notification to 31.3.2010; technology-specific tariff periods running from commercial operation; the categories sent to project-specific tariff instead of generic norms and what a petition must contain; a single-part tariff built from fixed-cost components (two-part for fuel-based technologies); levellisation over useful life but tariff specified for the tariff period; and must-run treatment for most RE plants, with biomass of 10 MW and above and cogeneration left to IEGC scheduling and despatch.

Chapter 2 (pp13–18) sets the shared financial norms — capital cost scope, debt-equity, loan tenure and interest, differential depreciation, return on equity, working capital, O&M with escalation, rebate, late-payment surcharge, CDM benefit sharing, treatment of subsidies and accelerated depreciation, and pass-through of taxes and duties.

Chapters 3–8 (pp19–40) are technology chapters for wind, small hydro, biomass, non-fossil fuel cogeneration, solar PV and solar thermal. Each specifies capital cost with a WPI-linked indexation formula, capacity utilisation or plant load factor, auxiliary consumption, station heat rate where relevant, and O&M expenses; the fuel-based chapters add fuel price, calorific value and a fuel-price indexation mechanism with a flat-escalation option.

Chapter 9 (p41) allows tariff to be determined in deviation from the norms within a levellised-tariff ceiling and gives the Commission a power to relax. The annexures carry the petition formats — Forms 1.1/2.1 for assumptions and 1.2/2.2 for tariff components (pp42–45) — and a Schedule of the C-WET state-wise wind power density map (p46, referenced at p21).

Standard name
Renewable Energy Tariff Regulations
Primary topics
Renewable energy tariff, Tariff determination, Capital cost and investment

Read with this

Amendments and corrections

Commencement notices and reasons

Other copies of these documents (1)

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document