RE Tariff Regulations, 2009 — First Amendment, 2010

Central Electricity Regulatory Commission (Terms and Conditions for Tariff determination from Renewable Energy Sources) (First Amendment) Regulations, 2010

Amendment · Gazette copyDated 25 Feb 2010Published in the Gazette 25 Feb 2010No. L-7/186(201)/2009-CERC dated New Delhi, the 25th February, 2010

Replaced by Terms and Conditions for Tariff Determination from Renewable Energy Sources Regulations, 2012

See that regulation for the date it took effect and for anything it keeps in force.

The Gazette copy of the Renewable Energy Tariff Regulations, 2009 — First Amendment, 2010.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a two-page gazette notification (p1–2) by which the Central Electricity Regulatory Commission amends its 2009 renewable energy tariff regulations. Issued at New Delhi on 25 February 2010 as No. L-7/186(201)/2009-CERC under Section 61 read with Section 178(2)(s) of the Electricity Act, 2003, it is the First Amendment to the CERC (Terms and Conditions for Tariff determination from Renewable Energy Sources) Regulations, 2009, and comes into force from publication in the Official Gazette — the Gazette date printed is 25 February 2010 (p1–2).

The operative change is a single new sub-clause in Regulation 8 of the principal regulations (p2). The existing Clause (2) is renumbered Clause (3), and a new Clause (2) is inserted to carry the generic tariff determined on 2010-11 capital cost and other norms forward: for Solar PV projects that tariff also applies in 2011-12, and for Solar thermal projects it also applies in 2011-12 and 2012-13. The extension is conditional: PPAs must be signed on or before 31 March 2011, and the entire contracted capacity must be commissioned by 31 March 2012 (Solar PV) or 31 March 2013 (Solar thermal).

A footnote records that the principal regulations were published in the Gazette of India, Extraordinary, Part III, Section 4 on 17 September 2009 (p2). Nothing else in the principal regulations is touched.

Standard name
Renewable Energy Tariff Regulations
Primary topics
Renewable energy tariff

Read with this

The regulation

Amendments and corrections

Commencement notices and reasons

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document