CERC · Central Electricity Regulatory Commission
RE Tariff Regulations, 2009 — Statement of Objects and Reasons
CERC (Terms and Conditions for Tariff determination from Renewable Energy Sources) Regulations, 2009
Statement of reasonsDated 7 Oct 2009
Replaced by Terms and Conditions for Tariff Determination from Renewable Energy Sources Regulations, 2012
See that regulation for the date it took effect and for anything it keeps in force.
The commission's reasons for the Renewable Energy Tariff Regulations, 2009 or one of its amendments.
Summary
Summary written by software, from pages 1 to 33 of 77. Check the regulator's original before you rely on it.
This is the Statement of Objects and Reasons for the CERC (Terms and Conditions for Tariff determination from Renewable Energy Sources) Regulations, 2009. It explains why the Commission framed the regulations, records what stakeholders objected to in the draft, and gives the reasoning behind each norm retained or changed. Its sections mirror the regulation's own arrangement, so a reader can find the rationale for a specific norm under the matching heading (p1, pp23, 27, 32).
Pages 1–2 set out the legal basis: the Commission's tariff jurisdiction over central and multi-state generating companies, the power to make tariff regulations, the pre-publication requirement, and the Tariff Policy duty to frame guidelines for pricing non-firm power from non-conventional sources. The consultation history is recorded — two public notices, and a public hearing whose submissions and participants sit in Annexure-I and Annexure-II (p2).
Pages 2–9 deal with definitions and scope: interconnection point, non-firm power, the meaning of renewable energy sources, small hydro (up to 25 MW, sub-divided at 5 MW), useful life, the scope of the regulations and eligibility criteria. Pages 9–13 cover general principles — control period, tariff period, project-specific tariff, tariff structure and design, must-run status and scheduling, and grid connectivity. Pages 14–21 cover financial principles: evacuation infrastructure, debt-equity, loan tenure and interest, depreciation, return on equity, working capital interest, O&M, rebate and late-payment surcharge, CDM benefit sharing, subsidy/GBI and accelerated depreciation, and treatment of taxes and duties.
The remaining pages are technology chapters: wind (pp23–26) on capital cost, indexation and CUF norms set by wind power density zone; small hydro (pp27–30) on capital cost, auxiliary consumption, indexation, CUF and O&M; and biomass (pp32–33) on eligible technology, capital cost and indexation. Throughout, the pattern is draft position, stakeholder objection, Commission's finding and the modification carried into the final regulations.
Read with this
The regulation
- Dated 16 Sep 2009Renewable Energy Tariff Regulations, 2009
Amendments and corrections
- Dated 25 Feb 2010Renewable Energy Tariff Regulations, 2009 — First Amendment, 2010
Commencement notices and reasons
Procedures and orders made under it
Other copies of these documents (1)
- Dated 25 Feb 2010RE Tariff Regulations, 2009 — First Amendment, 2010
Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.