RE Tariff Regulations, 2009 — Statement of Objects and Reasons

CERC (Terms and Conditions for Tariff determination from Renewable Energy Sources) Regulations, 2009

Statement of reasonsDated 7 Oct 2009

Replaced by Terms and Conditions for Tariff Determination from Renewable Energy Sources Regulations, 2012

See that regulation for the date it took effect and for anything it keeps in force.

The commission's reasons for the Renewable Energy Tariff Regulations, 2009 or one of its amendments.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software, from pages 1 to 33 of 77. Check the regulator's original before you rely on it.

This is the Statement of Objects and Reasons for the CERC (Terms and Conditions for Tariff determination from Renewable Energy Sources) Regulations, 2009. It explains why the Commission framed the regulations, records what stakeholders objected to in the draft, and gives the reasoning behind each norm retained or changed. Its sections mirror the regulation's own arrangement, so a reader can find the rationale for a specific norm under the matching heading (p1, pp23, 27, 32).

Pages 1–2 set out the legal basis: the Commission's tariff jurisdiction over central and multi-state generating companies, the power to make tariff regulations, the pre-publication requirement, and the Tariff Policy duty to frame guidelines for pricing non-firm power from non-conventional sources. The consultation history is recorded — two public notices, and a public hearing whose submissions and participants sit in Annexure-I and Annexure-II (p2).

Pages 2–9 deal with definitions and scope: interconnection point, non-firm power, the meaning of renewable energy sources, small hydro (up to 25 MW, sub-divided at 5 MW), useful life, the scope of the regulations and eligibility criteria. Pages 9–13 cover general principles — control period, tariff period, project-specific tariff, tariff structure and design, must-run status and scheduling, and grid connectivity. Pages 14–21 cover financial principles: evacuation infrastructure, debt-equity, loan tenure and interest, depreciation, return on equity, working capital interest, O&M, rebate and late-payment surcharge, CDM benefit sharing, subsidy/GBI and accelerated depreciation, and treatment of taxes and duties.

The remaining pages are technology chapters: wind (pp23–26) on capital cost, indexation and CUF norms set by wind power density zone; small hydro (pp27–30) on capital cost, auxiliary consumption, indexation, CUF and O&M; and biomass (pp32–33) on eligible technology, capital cost and indexation. Throughout, the pattern is draft position, stakeholder objection, Commission's finding and the modification carried into the final regulations.

Standard name
Renewable Energy Tariff Regulations
Primary topics
Renewable energy tariff, Tariff determination, Capital cost and investment

Read with this

The regulation

Amendments and corrections

Commencement notices and reasons

Other copies of these documents (1)

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document