MPERC · Madhya Pradesh Electricity Regulatory Commission

Wind and Solar Forecasting, Scheduling and Deviation Settlement Mechanism Regulations, 2018

Madhya Pradesh Electricity Regulatory Commission (Forecasting, Scheduling, Deviation Settlement Mechanism and related matters of Wind and Solar generating stations) Regulations, 2018.

RegulationDated 12 Apr 2018No. 513/2018/MPERC dated 12th April, 2018

3 amendments to it are on Voltaic, the latest dated 3 Oct 2025.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on mperc.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

These are MPERC's 2018 regulations for forecasting, scheduling and deviation settlement for wind and solar generating stations in Madhya Pradesh, issued at Bhopal on 12 April 2018 and effective from the (unprinted) date of Gazette publication (p1). They apply to sellers and buyers in short-, medium- and long-term open access, covering wind generators of 10 MW and above and solar generators of 5 MW and above, including pooling-station-connected projects selling inside or outside the State (p4).

Regulation 2 defines the working vocabulary — deviation, the 'Absolute Error' formula for RE, Available Capacity, pooling station, QCA and 'State Entity' — and Regulation 3 states the objective of grid discipline and security (p1–4). Regulation 4 lays down pre-conditions for participation: non-discriminatory treatment, contracts disclosed to SLDC, binding despatch instructions, BPTA/connection agreements and meters capable of 15-minute recording at injection and drawal points (p5).

Regulation 5 sets the design parameters of the mechanism — 96 fifteen-minute time blocks (migratable to 288 five-minute blocks on notification), weekly settlement, energy and money units, the deviation price vector, deviation volume limits and allocation of intra-state transmission losses (p6–7). Regulation 6 covers day-ahead scheduling, the option for wind/solar generators to use SLDC's forecast or their own, QCA aggregation and commercial settlement, the anti-gaming procedure, RE-specific deviation treatment and REC-based balancing of deemed RPO (p7–10). Regulation 7 makes SLDC instructions binding on grid-security grounds (p10).

Regulation 8 provides for weekly deviation statements and operation of the State Deviation Pool Account with a payment waterfall (p10–11). Regulation 9 sets payment timelines, interest on delayed payment, Letter of Credit obligations and encashment (p11–13). Regulation 10 requires SLDC to frame Operating Procedures and constitute a State Power Committee within three months; Regulations 11–13 give the Commission power to relax provisions, issue directions and reserve its inherent powers (p13–14). The Schedule applies four deviation-charge tables distinguishing inter-state from intra-state transactions and existing from new projects (p14–16).

Standard name
Forecasting, Scheduling and DSM for Wind and Solar
Primary topics
Scheduling and despatch, Deviation settlement (DSM), Energy accounting and settlement

Read with this

Other copies of these documents (1)

5 more documents belong here and are not on Voltaic: 4 copies in another language and 1 commencement notice or statement of reasons not held as English text.

Voltaic last read MPERC's website for final documents between 24 Nov 2026 and 26 Nov 2026 (4 pages). A document MPERC issued after the page that lists it was read may not be held by Voltaic yet.

As of its reading of MPERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on mperc.in ↗