MPERC · Madhya Pradesh Electricity Regulatory Commission
Forecasting, Scheduling, DSM and Related Matters of Wind and Solar Generating Stations Regulations, 2018 — Third Amendment, 2025
Madhya Pradesh Electricity Regulatory Commission (Forecasting, Scheduling, Deviation Settlement Mechanism and related Matters of wind and Solar Generating Stations) Regulations, 2018 (Third Amendment) {AG-44(iii) of 2025}
AmendmentDated 3 Oct 2025No. 1925/MPERC/2025 dated 03.10.2025
Amends the Wind and Solar Forecasting, Scheduling and Deviation Settlement Mechanism Regulations, 2018.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is the Third Amendment to MPERC's 2018 Forecasting, Scheduling, Deviation Settlement Mechanism and related Matters Regulations for wind and solar generating stations, notified on 03.10.2025 and numbered 1925/MPERC/2025 (p1). It comes into force on publication in the Madhya Pradesh Gazette and extends to the whole State (p1). The instrument is purely amendatory: it rewrites definitions, resets the applicability clause, and reworks Annexure-I of the principal regulations.
Regulation 2 (p1–4) rebuilds the definitional base. It inserts Area Clearing Price, Energy Storage System, General Seller, Reference Charge Rate and Renewable Energy Generating Station, and substitutes Available Capacity, Deviation-RE (with its error formula), RE Projects and Pooling Station — pulling hybrid projects, projects with or without ESS, and stand-alone ESS into the regime irrespective of commissioning date.
Regulation 3 (p4) resets who is bound, by technology and size, and distinguishes projects selling within the State from those selling outside it under open access.
Regulation 4 (p4–8) amends Annexure-I: QCA duties to declare Available Capacity and forecast generation block-wise on a day-ahead basis with intraday revision; separate metering and a separate drawl connection for ESS-coupled projects; SLDC computation of deviation charges; shortfall and excess settlement through the State Deviation Pool Account; how the Fixed Rate is determined; a virtual pool of all RE and storage; a new clause governing deviation charges for stand-alone ESS and ESS-coupled projects by reference to CERC's DSM Regulations 2024, with a transition for pumped hydro storage; and a revised QCA bank-guarantee payment security regime.
Read with this
The regulation
Amendments and corrections
Other copies of these documents (1)
5 more documents belong here and are not on Voltaic: 4 copies in another language and 1 commencement notice or statement of reasons not held as English text.
Voltaic last read MPERC's website for final documents between 24 Nov 2026 and 26 Nov 2026 (4 pages). A document MPERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.