MPERC · Madhya Pradesh Electricity Regulatory Commission

Forecasting, Scheduling, DSM and Related Matters of Wind and Solar Generating Stations Regulations, 2018 — Third Amendment, 2025

Madhya Pradesh Electricity Regulatory Commission (Forecasting, Scheduling, Deviation Settlement Mechanism and related Matters of wind and Solar Generating Stations) Regulations, 2018 (Third Amendment) {AG-44(iii) of 2025}

AmendmentDated 3 Oct 2025No. 1925/MPERC/2025 dated 03.10.2025

Amends the Wind and Solar Forecasting, Scheduling and Deviation Settlement Mechanism Regulations, 2018.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on mperc.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the Third Amendment to MPERC's 2018 Forecasting, Scheduling, Deviation Settlement Mechanism and related Matters Regulations for wind and solar generating stations, notified on 03.10.2025 and numbered 1925/MPERC/2025 (p1). It comes into force on publication in the Madhya Pradesh Gazette and extends to the whole State (p1). The instrument is purely amendatory: it rewrites definitions, resets the applicability clause, and reworks Annexure-I of the principal regulations.

Regulation 2 (p1–4) rebuilds the definitional base. It inserts Area Clearing Price, Energy Storage System, General Seller, Reference Charge Rate and Renewable Energy Generating Station, and substitutes Available Capacity, Deviation-RE (with its error formula), RE Projects and Pooling Station — pulling hybrid projects, projects with or without ESS, and stand-alone ESS into the regime irrespective of commissioning date.

Regulation 3 (p4) resets who is bound, by technology and size, and distinguishes projects selling within the State from those selling outside it under open access.

Regulation 4 (p4–8) amends Annexure-I: QCA duties to declare Available Capacity and forecast generation block-wise on a day-ahead basis with intraday revision; separate metering and a separate drawl connection for ESS-coupled projects; SLDC computation of deviation charges; shortfall and excess settlement through the State Deviation Pool Account; how the Fixed Rate is determined; a virtual pool of all RE and storage; a new clause governing deviation charges for stand-alone ESS and ESS-coupled projects by reference to CERC's DSM Regulations 2024, with a transition for pumped hydro storage; and a revised QCA bank-guarantee payment security regime.

Standard name
Forecasting, Scheduling and DSM for Wind and Solar
Primary topics
Scheduling and despatch, Deviation settlement (DSM), Energy storage deployment

Read with this

Other copies of these documents (1)

5 more documents belong here and are not on Voltaic: 4 copies in another language and 1 commencement notice or statement of reasons not held as English text.

Voltaic last read MPERC's website for final documents between 24 Nov 2026 and 26 Nov 2026 (4 pages). A document MPERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on mperc.in ↗

Report an issue with this document