MPERC · Madhya Pradesh Electricity Regulatory Commission

Forecasting, Scheduling and DSM for Wind and Solar Generating Stations Regulations, 2018 — Third Amendment, 2025

Madhya Pradesh Electricity Regulatory Commission (Forecasting, Scheduling, Deviation Settlement Mechanism and related Matters of wind and Solar Generating Stations) Regulations, 2018 (Third Amendment) {AG-44(iii) of 2025}

Amendment · Gazette copyDated 3 Oct 2025No. 1925/MPERC/2025 dated 3rd October 2025

The Gazette copy of the Forecasting, Scheduling, DSM and Related Matters of Wind and Solar Generating Stations Regulations, 2018 — Third Amendment, 2025.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on mperc.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the Third Amendment by the Madhya Pradesh Electricity Regulatory Commission to its 2018 regulations on forecasting, scheduling, deviation settlement and related matters for wind and solar generating stations (p1). It is notified as No. 1925/MPERC/2025, dated 3 October 2025 at Bhopal, extends to the whole of Madhya Pradesh, and comes into force from the date of its publication in the Madhya Pradesh Gazette (p1).

Regulation 2 rewrites definitions in clause 2(1) of the Principal Regulations (pp1–4). It inserts Area Clearing Price, Energy Storage System, General Seller, Reference Charge Rate and Renewable Energy Generating Station; substitutes Available Capacity (with a hybrid-project cap tied to connectivity permission and BPTA), Deviation-RE / Absolute Error (with a formula and a separate deviation formula for stand-alone ESS), RE Projects (expressly irrespective of date of commissioning) and Pooling Station (including a fallback where no separate pooling station exists, and provisions for hybrid projects at up to two locations).

Regulation 3 replaces the applicability clause, bringing sellers in short-, medium- and long-term open access in intra-state transmission and distribution (including wheeling) within scope, with capacity thresholds for wind, solar and hybrid generators, stand-alone ESS, and projects selling outside the State (p4).

Regulation 4 amends Annexure-I (pp4–8). It gives QCAs responsibility for 15-minute block-wise available capacity and forecasts, including ESS injection and charging schedules; requires separate metering of pooling stations and ESS and a separate connection for auxiliary/synchronisation drawl; provides for SLDC computation of deviation charges from SLDC schedules and SEM/AMR data; substitutes the clauses on shortfall and excess generation, fixed rate and open-access fixed rate; adds a new clause 6(e)(III) computing stand-alone ESS and ESS coupled with wind/solar as a general seller under CERC DSM Regulations 2024, with a pumped-hydro transition to 31.03.2026; and replaces the payment-security clause for QCAs, setting per-MW bank-guarantee amounts by technology, validity, annual review, and encashment and recoupment timelines. The document is signed by the Commission Secretary (p8).

Standard name
Forecasting, Scheduling and DSM for Wind and Solar
Primary topics
Scheduling and despatch, Deviation settlement (DSM), Energy storage deployment

Read with this

5 more documents belong here and are not on Voltaic: 4 copies in another language and 1 commencement notice or statement of reasons not held as English text.

Voltaic last read MPERC's website for final documents between 24 Nov 2026 and 26 Nov 2026 (4 pages). A document MPERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on mperc.in ↗

Report an issue with this document