Forecasting, Scheduling and DSM for Wind and Solar Generating Stations Regulations, 2018 — Second Amendment, 2024

Madhya Pradesh Electricity Regulatory Commission (Forecasting, Scheduling, Deviation Settlement Mechanism and related Matters of wind and Solar Generating Stations) Regulations, 2018 (Second Amendment) {AG-44(ii) of 2024}

AmendmentDated 14 Mar 2024No. 691/MPERC/2024 dated 14th March 2024

Amends the Wind and Solar Forecasting, Scheduling and Deviation Settlement Mechanism Regulations, 2018.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on mperc.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

MPERC's Second Amendment to its 2018 forecasting, scheduling and deviation settlement (DSM) regulations for wind and solar generators, issued at Bhopal on 14 March 2024 (p1). Its purpose is to bring solar-wind hybrid projects fully into the regime, tighten definitions and applicability, and rework the deviation-charge mechanics in Annexure-I.

Regulation 2 amends the definitions. It inserts "Solar Wind Hybrid Generation Project" — wind and solar combined, with or without energy storage, subject to one resource being at least 33% of total contracted capacity (p1) — redefines Available Capacity for hybrid and state-entity generators (p1–2), omits one sub-clause, and substitutes "RE Projects" to cover all wind, solar and hybrid projects irrespective of commissioning date, and "Pooling Station", with provisos allowing a hybrid project at up to two non-co-located points connected by dedicated feeders (p2).

Regulation 3 resets who the regulations bind: sellers using intra-state short-, medium- or long-term open access, covering wind at 10 MW and above, solar at 5 MW and above and hybrids at 10 MW and above, plus sellers outside the State at 1 MW and above (p2–3).

Regulation 4 rewrites the DSM machinery in Annexure-I. Clause 6 now says who computes deviation charges and splits inter-state from intra-state treatment, defines Fixed Rate as the s.62-determined or s.63-adopted PPA rate (weighted average where there are multiple PPAs, with an affidavit to SLDC), falls back to the national APPC rate where no PPA exists, and treats all RE generators as a single virtual pool (pp3–5). Clause 8 adds bank-guarantee provision for hybrid projects and a three-year validity with annual SLDC review of payment security (p5). A 2005 reference in the principal regulations' procedure is replaced by 2021 (p5), and new clauses 10(A)–10(B) let the Commission issue orders on use of funds in the Renewable Energy DSM Pool Account and require SLDC to submit a hybrid forecasting/scheduling/deviation-computation procedure within two months, with interim aggregation of pooling-station schedule and meter data meanwhile (p5–6). Annexure tables IA–IV set out the deviation-charge slabs (pp6–8).

Standard name
Forecasting, Scheduling and DSM for Wind and Solar
Primary topics
Scheduling and despatch, Deviation settlement (DSM), Open access

Read with this

Other copies of these documents (1)

5 more documents belong here and are not on Voltaic: 4 copies in another language and 1 commencement notice or statement of reasons not held as English text.

Voltaic last read MPERC's website for final documents between 24 Nov 2026 and 26 Nov 2026 (4 pages). A document MPERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on mperc.in ↗

Report an issue with this document