Wind and Solar Forecasting, Scheduling and DSM (First Amendment) Regulations, 2018

Madhya Pradesh Electricity Regulatory Commission (Forecasting, Scheduling, Deviation Settlement Mechanism and related matters of Wind and Solar generating stations) (First amendment) Regulations, 2018. {AG-44(i) of 2019}

AmendmentDated 25 Sep 20191322/MPERC/2019 dated 25.09. 2019

Amends the Wind and Solar Forecasting, Scheduling and Deviation Settlement Mechanism Regulations, 2018.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on mperc.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the Madhya Pradesh Electricity Regulatory Commission's First Amendment to its 2018 Regulations on forecasting, scheduling and deviation settlement for wind and solar generating stations, issued at Bhopal on 25 September 2019 under section 181 of the Electricity Act 2003 (p1). It amends the principal Regulations definition by definition: it omits some clauses in Regulation 2, substitutes the definitions of 'Deviation' and 'Gaming', inserts 'MRI', renames the 'Pool Account' as the 'State Deviation Pool Account', and clarifies pooling-station and metering/telemetry wording (p1–2). It substitutes Regulation 3 (objective and scope), bringing wind and solar generators using intra-state or inter-state open access within the DSM, with lower capacity thresholds for those selling outside the State (p2). It amends Regulation 4 on metering, AMR and the mandatory common QCA, with SLDC empowered to advise disconnection of defaulting generators (p4). It substitutes Regulations 5 and 6, which set the design parameters of the deviation settlement mechanism (scheduling period, pool account, settlement period, measurement units and price vector) and the forecasting, scheduling and anti-gaming procedure through the Grid Code, Open Access Regulations 2005 and Annexure-I (p4–6). Regulations 7–9 are omitted, and Regulation 10 is amended to require SLDC to form a State Power Committee within two months (pp3, 6). The appended Annexure-I Operating Procedure (pp7–25) covers QCA eligibility, appointment, registration and roles; preconditions for participation; day-ahead AvC declaration and scheduling; metering and data collection; computation and settlement of deviation charges; bank-guarantee security; events of default; and four deviation-charge tables for different transaction types and commissioning vintages. Annexures II–VII (pp26–35) supply QCA consent, registration application, undertaking, declaration and indemnity formats, telemetry/communication planning guidelines, and the AvC and forecast proforma. Commencement is from Gazette publication, whose date is not printed; several transitional deadlines run from the notification date.

Standard name
Forecasting, Scheduling and DSM for Wind and Solar
Primary topics
Scheduling and despatch, Deviation settlement (DSM), Metering

Read with this

Other copies of these documents (1)

5 more documents belong here and are not on Voltaic: 4 copies in another language and 1 commencement notice or statement of reasons not held as English text.

Voltaic last read MPERC's website for final documents between 24 Nov 2026 and 26 Nov 2026 (4 pages). A document MPERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on mperc.in ↗

Report an issue with this document