APERC · Andhra Pradesh Electricity Regulatory Commission
Renewable Power Purchase Obligation (Compliance by Purchase of RE/REC) Regulation, 2022 — Statement of Reasons
In the matter of Andhra Pradesh State Electricity Regulatory Commission Renewable Power Purchase Obligation (Compliance by Purchase of Renewable Energy/Renewable Energy Certificates) Regulation, 2022.
Statement of reasonsDate not stated
The commission's reasons for the Renewable Power Purchase Obligation (Compliance by Purchase of Renewable Energy / Renewable Energy Certificates) Regulations, 2022 or one of its amendments.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is APERC's Statement of Reasons accompanying the final Andhra Pradesh State Electricity Regulatory Commission Renewable Power Purchase Obligation (Compliance by Purchase of Renewable Energy/Renewable Energy Certificates) Regulation, 2022 (p1). It is not the regulation itself: it records the draft that was hosted for comment on 17.03.2022, the eight stakeholders who responded, and, issue by issue, the Commission's reasoning and the changes made to the draft.
The Introduction (p1–2) sets out the statutory basis — ss.61(h), 86(1)(e) and 181 of the Electricity Act, 2003 — the obligated entities (distribution licensees, open access consumers and captive consumers with grid-connected captive plants above 1 MW), and the external instruments weighed before finalisation: CERC's REC Regulations 2022 and the Ministry of Power's 22.07.2022 RPO trajectory order.
The body (pp2–15) works through the objections labelled A to V. The largest decisions: merge solar and non-solar into a single RPPO and delete the related solar/non-solar clauses (pp2–3); let captive consumers meet RPPO from their own RE (p3); allow RE purchases on power exchanges via Green-DAM/Green-TAM (p3); permit the last quarter's RPPO to be met in the first quarter of the next year (pp3–4); insert monthly and annual reporting timelines for obligated entities to the State Agency and a one-month deadline for the State Agency to report surplus RE to the Commission (pp4–5); include all hydel projects, and pumped storage where reverse pumping uses renewable energy, as renewable sources (p5); stop excluding RE consumption from RPPO computation (pp5–6); reject separate hydro/wind/storage obligations and reject substantially higher RPPO targets, allowing only a nominal increase for FY 2025-26 and FY 2026-27 (pp6–8); adopt a 'Hybrid Energy Sources' definition (p8); delete the Power Wheeling and Purchase Agreement exemption (pp8–9); require each distribution licensee to buy 100% of Waste-to-Energy output located in its supply area (p9); reorder captive compliance to RE procurement first, RECs second (p10); refuse banking for rooftop-solar-based open access/captive consumers (p10); reject separate public proceedings on RPPO compliance, incentive/penalty additions, and a storage purchase obligation (pp10–12); retain the pooled cost of power purchase clause (pp11–12); relax separate rooftop-solar metering where existing meters meet CEA Metering Regulations (p12). It also records the Commission's answers on the basis for the RPPO percentages, the need for a public hearing (held not mandatory under the Electricity (Procedure for Previous Publication) Rules, 2005), and the RESCO licence-exemption matter left under adjudication (pp12–15). Paragraph 3 (p15) lists residual drafting changes, including moving the pooled-cost petition deadline from 30 April to 30 September. The Annexure (p16) names the eight objectors.
Read with this
The regulation
Amendments and corrections
Procedures and orders made under it
Consolidated copies, for reference (1)
Earlier drafts
- Dated 17 Mar 2022Renewable Power Purchase Obligation Regulations, 2022
- Dated 17 Mar 2022Public notice: Renewable Power Purchase Obligation Regulation, 2022 — Public Notice on draft
- Dated 5 Jun 2023Renewable Power Purchase Obligation Regulations, 2022 — First Amendment — Draft