APERC · Andhra Pradesh Electricity Regulatory Commission
Renewable Power Purchase Obligation Regulations, 2022 — First Amendment — Draft
First Amendment to APERC Renewable Power Purchase Obligation (Compliance by purchase of Renewable Energy/ Renewable Energy Certificates) Regulations, 2022
Draft amendmentDated 5 Jun 2023Regulation 6 of 2023 dated 05-06-2023
Draft
A proposal that has since been finalised as the Renewable Power Purchase Obligation (Compliance by Purchase of Renewable Energy / Renewable Energy Certificates) Regulations, 2022 — First Amendment, 2023.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is the Andhra Pradesh Electricity Regulatory Commission's first amendment to its Renewable Power Purchase Obligation (Compliance by Purchase of Renewable Energy/Renewable Energy Certificates) Regulations, 2022, issued as Regulation 6 of 2023 (p1). Its core move is to make the distribution licensee itself a source of renewable energy for obligated and non-obligated entities at a Green Tariff, so that a buyer need not migrate to the separate 'Green Power' category (p1–2).
The introduction (p1) sets out the trigger for the amendment: the Government of India's Electricity (Promoting Renewable Energy Through Green Energy Open Access) Rules, 2022 of June 2022, which named distribution licensees as a source of RE at a Green Tariff to be determined by SERCs, and the Ministry of Power letter of 13.05.23 suggesting how that tariff should be built up relative to the average power purchase cost of RE, a surcharge on ACoS and a margin. It records that the DISCOMs hold surplus renewable energy above their FY 2023-24 RPPO under the RST Order, and cites the Commission's powers under the Electricity Act, 2003 (p1).
Clause 1 gives the short title, ties commencement to publication in the official Gazette, and applies the regulation to the whole State of Andhra Pradesh (p2). Clauses 2 and 3 insert provisos into sub-clauses 3.2 and 3.3 so that renewable energy bought from the distribution licensee under the new procedure counts towards the RPPO of an open access consumer and a captive consumer respectively (p2).
Clause 4 inserts a new sub-clause 3.4 (pp2–4), which carries the operative machinery: how entities elect and requisition RE and the lead times for doing so; voluntary purchase above the obligation up to full consumption; the floor for how much RE must be taken; how the Green Tariff is set for FY 2023-24 and left to future RST Orders thereafter; monthly digital (or on-request physical) certificates from the licensee; the option for all consumers to take 100% RE without opting into a separate category; a minimum requisition period; the treatment of RE bought in excess of an obligated entity's RPO as counting towards the distribution licensee's own RPO; separate accounting of the Green Tariff sub-category at ARR and truing-up; a yearly Green Stars Certificate with a star rating tied to the share of RE in consumption, also flagged in monthly bills; publicity duties on the licensee; and periodic review of the Green Tariff and modalities in Retail Supply Tariff proceedings. The document closes with the order of the Commission, dated at Hyderabad 05-06-2023 (p4).
Read with this
The regulation
Amendments and corrections
Commencement notices and reasons
Procedures and orders made under it
Consolidated copies, for reference (1)
Earlier drafts
- Dated 17 Mar 2022Renewable Power Purchase Obligation Regulations, 2022
- Dated 17 Mar 2022Public notice: Renewable Power Purchase Obligation Regulation, 2022 — Public Notice on draft
Voltaic last read APERC's website for final documents on 24 Nov 2026 (2 pages) and for drafts on 21 Nov 2026. A document APERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.