APERC · Andhra Pradesh Electricity Regulatory Commission
Renewable Power Purchase Obligation Regulations, 2022
APERC Renewable Power Purchase Obligation (Compliance by purchase of Renewable Energy/Renewable Energy Certificates) Regulations, 2022
Draft regulationDated 17 Mar 2022
Draft
A proposal that has since been finalised as the Renewable Power Purchase Obligation (Compliance by Purchase of Renewable Energy / Renewable Energy Certificates) Regulations, 2022.
Summary
Summary written by software. Check the regulator's original before you rely on it.
The Andhra Pradesh Electricity Regulatory Commission sets the Renewable Power Purchase Obligation (RPPO) for the five-year block beginning 1 April 2022, taking over from the obligation period fixed by the 2017 RPPO regulations, which ran to 31 March 2022 (p1). The regulations come into force on 1 April 2022 and apply throughout Andhra Pradesh (p1).
Clause 2 supplies the working vocabulary — obligated entity, certificate (REC), State Agency, pooled cost of power purchase, RESCO, and the list of sources treated as renewable — and defers to the Act, CERC regulations and the Commission's own regulations for anything undefined (p1–3).
Clause 3 is the operative core. It imposes the obligation on three classes — every distribution licensee (3.1, p3–5), every open access consumer (3.2, p5–6) and every grid-connected captive consumer with a plant of 1 MW and above, including self-consuming plants that fail captive eligibility (3.3, p7–8) — and points to TABLE-I (p3) for the year-wise targets. It sets the consumption base, the routes that count towards compliance (own renewable purchase, RECs, rooftop solar under net metering, bundled thermal, purchases from other licensees), the solar/non-solar split with cross-adjustment once compliance reaches a threshold, compulsory offtake from waste-to-energy plants, an exemption for third-party power wheeling purchases, and the Commission's power to revise targets in any year. A closing note governs metering for co-located renewable plants (p8).
Clause 4 covers how RECs are deposited with, and independently verified by, the State Agency (p9). Clause 5 sets out the State Agency's functions, quarterly reporting to the Commission, its remuneration and its replacement (p9). Clause 6 routes REC eligibility to the CERC REC framework and lays down the procedure for determining pooled cost of power purchase, including a provisional rate carried forward and a later true-up (p10); the standard PPA under the 2012 regulation continues.
Clause 7 gives the default regime: notices, a fund held by APSLDC, a bar on open access and penalty under section 142 (p10–11). Clauses 8 to 10 provide savings for actions taken under the 2017 regulation, a power to remove difficulties, and miscellaneous provisions (p11). Signed at Hyderabad on 17 March 2022 (p11).
Read with this
The regulation
Amendments and corrections
Commencement notices and reasons
Procedures and orders made under it
Consolidated copies, for reference (1)
Earlier drafts
- Dated 5 Jun 2023Renewable Power Purchase Obligation Regulations, 2022 — First Amendment — Draft
- Dated 17 Mar 2022Public notice: Renewable Power Purchase Obligation Regulation, 2022 — Public Notice on draft
Voltaic last read APERC's website for final documents on 24 Nov 2026 (2 pages) and for drafts on 21 Nov 2026. A document APERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.