Skip to content

APERC · Andhra Pradesh Electricity Regulatory Commission

Renewable Power Purchase Obligation Regulations, 2022

APERC Renewable Power Purchase Obligation (Compliance by purchase of Renewable Energy/Renewable Energy Certificates) Regulations, 2022

Draft regulationDated 17 Mar 2022

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on aperc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

The Andhra Pradesh Electricity Regulatory Commission sets the Renewable Power Purchase Obligation (RPPO) for the five-year block beginning 1 April 2022, taking over from the obligation period fixed by the 2017 RPPO regulations, which ran to 31 March 2022 (p1). The regulations come into force on 1 April 2022 and apply throughout Andhra Pradesh (p1).

Clause 2 supplies the working vocabulary — obligated entity, certificate (REC), State Agency, pooled cost of power purchase, RESCO, and the list of sources treated as renewable — and defers to the Act, CERC regulations and the Commission's own regulations for anything undefined (p1–3).

Clause 3 is the operative core. It imposes the obligation on three classes — every distribution licensee (3.1, p3–5), every open access consumer (3.2, p5–6) and every grid-connected captive consumer with a plant of 1 MW and above, including self-consuming plants that fail captive eligibility (3.3, p7–8) — and points to TABLE-I (p3) for the year-wise targets. It sets the consumption base, the routes that count towards compliance (own renewable purchase, RECs, rooftop solar under net metering, bundled thermal, purchases from other licensees), the solar/non-solar split with cross-adjustment once compliance reaches a threshold, compulsory offtake from waste-to-energy plants, an exemption for third-party power wheeling purchases, and the Commission's power to revise targets in any year. A closing note governs metering for co-located renewable plants (p8).

Clause 4 covers how RECs are deposited with, and independently verified by, the State Agency (p9). Clause 5 sets out the State Agency's functions, quarterly reporting to the Commission, its remuneration and its replacement (p9). Clause 6 routes REC eligibility to the CERC REC framework and lays down the procedure for determining pooled cost of power purchase, including a provisional rate carried forward and a later true-up (p10); the standard PPA under the 2012 regulation continues.

Clause 7 gives the default regime: notices, a fund held by APSLDC, a bar on open access and penalty under section 142 (p10–11). Clauses 8 to 10 provide savings for actions taken under the 2017 regulation, a power to remove difficulties, and miscellaneous provisions (p11). Signed at Hyderabad on 17 March 2022 (p11).

Standard name
RPO Regulations
Primary topics
Renewable purchase obligation (RPO / RCO), Renewable energy certificates (REC), Net metering

Read with this

Voltaic last read APERC's website for final documents on 24 Nov 2026 (2 pages) and for drafts on 21 Nov 2026. A document APERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on aperc.gov.in ↗

Report an issue with this document