Skip to content

APERC · Andhra Pradesh Electricity Regulatory Commission

Renewable Power Purchase Obligation Regulations, 2022 — First Amendment, 2023 — Consolidated

APERC Renewable Power Purchase Obligation (Compliance by purchase of Renewable Energy/ Renewable Energy Certificates) Regulations, 2022

Consolidated copyDated 31 Dec 2025Regulation No.5 of 2022 dated 29-09-2022

A consolidated copy of the Renewable Power Purchase Obligation (Compliance by Purchase of Renewable Energy / Renewable Energy Certificates) Regulations, 2022, published by APERC for reference. It may not include the latest amendments; read it with the amendments listed for the regulation.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on aperc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the Andhra Pradesh Electricity Regulatory Commission's Renewable Power Purchase Obligation regulation for periods after FY 2021-22, presented as a consolidated text with its First Amendment (Regulation No. 06 of 2023, dated 14-07-2023) already folded in (p1–2). It applies throughout Andhra Pradesh from the date of Gazette publication — the Gazette date itself is not printed — and binds distribution licensees, open access consumers and grid-connected captive consumers (p2, p5).

Clause 3 is the operative core. Table-I sets the RPPO as escalating percentages of consumption for successive periods from gazette publication through FY 2026-27 (p5), and the long series of provisos defines what counts towards compliance: own renewable generation, power-exchange purchases, rooftop solar under net metering and gross metering, purchases at mutually agreed prices, RE bundled with coal/lignite thermal, purchases from other DISCOMs, and RECs — but only where the generator does not itself claim RECs (pp5–7). The last quarter's obligation may be met in the first quarter of the next year; discoms must procure all output of waste-to-energy plants in their area; RESCO consumption is folded into the discom's consumption with no separate obligation on RESCOs; surplus purchases must be reported to the Commission; and the Commission may revise the percentages for any year (pp6–7). Parallel obligations, with similar provisos, are set for open access consumers (3.2, pp7–9) and for captive consumers of 1 MW and above (3.3, pp9–11), with a note requiring metering, sealing and monthly readings for co-located renewable plants (p11).

Sub-clause 3.4, inserted by the 2023 amendment, opens a Green Tariff route: any consumer, obligated or not, may requisition renewable energy from its discom, be supplied it without changing tariff category, receive monthly digital certificates and an annual 'Green Stars Certificate' graded by share of consumption, while the discom accounts separately for this business and is reviewed at retail supply tariff proceedings (pp11–14).

Clauses 4–6 deal with administration: REC handling and independent verification by the State Agency (p14); the State Agency's role — the SLDC unless the Commission designates another agency — with monthly and annual compliance returns from obligated entities and quarterly reporting to the Commission (pp14–15); and certificate eligibility plus the procedure and timeline for determining pooled cost of power purchase, with a provisional figure carried until the order issues (pp15–16).

Clause 7 prescribes default consequences: a notice to pay into a State Agency fund computed on the REC-price-linked value of the shortfall, barring of open access, and penalty under section 142 (p16). Clauses 8–10 save actions done under the 2017 regulation and give the Commission power to remove difficulties and to depart from its own procedure (pp16–17).

Standard name
RPO Regulations
Primary topics
Renewable purchase obligation (RPO / RCO), Open access, Captive status

Read with this

Voltaic last read APERC's website for final documents on 24 Nov 2026 (2 pages) and for drafts on 21 Nov 2026. A document APERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on aperc.gov.in ↗

Report an issue with this document