Skip to content

MERC · Maharashtra Electricity Regulatory Commission

Multi Year Tariff Regulations, 2024

Maharashtra Electricity Regulatory Commission (Multi Year Tariff) Regulations, 2024

Gazette copyDate not statedMERC/Tech/Regulation/2024/0512

A Gazette copy of the Multi Year Tariff Regulations, 2024.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on merc.gov.in ↗

Summary

Summary written by software, from pages 1 to 324 of 530. Check the regulator's original before you rely on it.

The Maharashtra Electricity Regulatory Commission (Multi Year Tariff) Regulations, 2024 — notification No. MERC/Tech/Regulation/2024/0512 — are the Commission's principal tariff framework for the five-year control period from 1 April 2025 to 31 March 2030 (p295). They supersede the 2019 MYT Regulations and take effect from the date of publication in the Official Gazette.

Regulation 1 sets the title, extent over the whole of Maharashtra and the entities covered: existing and future generating companies, transmission licensees, distribution and deemed distribution licensees, licence-exempt distribution/retail supply utilities, MSLDC, STU and Energy Storage System Developers, plus generating companies with integrated coal or lignite mines (p295). A proviso keeps ARR/tariff and review matters up to 31 March 2025 under the previous regulations (p296).

Regulation 2 (pp296–314) defines the vocabulary the rest of the Regulations runs on — availability for thermal stations and for transmission systems, aggregate revenue requirement, control period, energy storage, integrated mines, change in law, force majeure and useful life. Regulation 3 (pp314–315) lists what the Commission will determine: generation supply, energy storage, intra-State transmission, wheeling, retail supply, MSLDC and STU fees and charges and surcharges, while providing that competitively bid tariffs under s.63 are adopted rather than determined.

Part A: General Principles carries the framework. Regulation 4 (pp316–318) describes the MYT architecture — a forecast ARR petition for the whole control period, mid-term review and true-up cycles, and pass-through or sharing of controllable and uncontrollable gains and losses. Regulation 5 (pp318–320) sets the petition calendar and content for the MYT, mid-term review and true-up petitions, including truing-up of FY2022-23 to FY2024-25 under the 2019 Regulations, and relaxations for licensees whose tariff is not yet determined. Regulation 6 (pp321–322) specifies what the MYT petition must forecast and its links to resource adequacy, merit order despatch, RPO/ESO and EE/DSM targets. Regulation 7 (p322) lets the Commission stipulate performance trajectories. Regulation 8 (pp323–324) governs the mid-term review for distribution licensees, and Regulation 9 (p324) classifies uncontrollable factors (force majeure, change in law, fuel prices, sales, power purchase rates, transmission charges, interest and freight rates) against controllable factors (losses, operating norms, working-capital interest, O&M).

Pages 292–293, which precede the notification in this compiled PDF, contain the transmission availability formulae (Annexure VI). Parts B–L and the annexures are not included.

Standard name
Multi Year Tariff Regulations
Primary topics
Multi Year Tariff (MYT), Tariff determination, ARR and true-up

Read with this

The regulation

Commencement notices and reasons

Earlier drafts

3 more documents belong here and are not on Voltaic: 1 copy in another language, 1 draft or notice on a draft not held as English text and 1 procedure or order made under it.

Voltaic last read MERC's website for final documents on 24 Nov 2026 (8 pages) and for drafts on 24 Nov 2026. A document MERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on merc.gov.in ↗

Report an issue with this document