MERC · Maharashtra Electricity Regulatory Commission
Multi Year Tariff Regulations, 2024
Maharashtra Electricity Regulatory Commission (Multi Year Tariff) Regulations, 2024
Gazette copyDate not statedMERC/Tech/Regulation/2024/0512
A Gazette copy of the Multi Year Tariff Regulations, 2024.
Summary
Summary written by software, from pages 1 to 324 of 530. Check the regulator's original before you rely on it.
The Maharashtra Electricity Regulatory Commission (Multi Year Tariff) Regulations, 2024 — notification No. MERC/Tech/Regulation/2024/0512 — are the Commission's principal tariff framework for the five-year control period from 1 April 2025 to 31 March 2030 (p295). They supersede the 2019 MYT Regulations and take effect from the date of publication in the Official Gazette.
Regulation 1 sets the title, extent over the whole of Maharashtra and the entities covered: existing and future generating companies, transmission licensees, distribution and deemed distribution licensees, licence-exempt distribution/retail supply utilities, MSLDC, STU and Energy Storage System Developers, plus generating companies with integrated coal or lignite mines (p295). A proviso keeps ARR/tariff and review matters up to 31 March 2025 under the previous regulations (p296).
Regulation 2 (pp296–314) defines the vocabulary the rest of the Regulations runs on — availability for thermal stations and for transmission systems, aggregate revenue requirement, control period, energy storage, integrated mines, change in law, force majeure and useful life. Regulation 3 (pp314–315) lists what the Commission will determine: generation supply, energy storage, intra-State transmission, wheeling, retail supply, MSLDC and STU fees and charges and surcharges, while providing that competitively bid tariffs under s.63 are adopted rather than determined.
Part A: General Principles carries the framework. Regulation 4 (pp316–318) describes the MYT architecture — a forecast ARR petition for the whole control period, mid-term review and true-up cycles, and pass-through or sharing of controllable and uncontrollable gains and losses. Regulation 5 (pp318–320) sets the petition calendar and content for the MYT, mid-term review and true-up petitions, including truing-up of FY2022-23 to FY2024-25 under the 2019 Regulations, and relaxations for licensees whose tariff is not yet determined. Regulation 6 (pp321–322) specifies what the MYT petition must forecast and its links to resource adequacy, merit order despatch, RPO/ESO and EE/DSM targets. Regulation 7 (p322) lets the Commission stipulate performance trajectories. Regulation 8 (pp323–324) governs the mid-term review for distribution licensees, and Regulation 9 (p324) classifies uncontrollable factors (force majeure, change in law, fuel prices, sales, power purchase rates, transmission charges, interest and freight rates) against controllable factors (losses, operating norms, working-capital interest, O&M).
Pages 292–293, which precede the notification in this compiled PDF, contain the transmission availability formulae (Annexure VI). Parts B–L and the annexures are not included.
Read with this
The regulation
- Date not statedMulti Year Tariff Regulations, 2024
Commencement notices and reasons
- Dated 19 Aug 2024Multi Year Tariff Regulations, 2024 — Statement of Reasons
Earlier drafts
- Released with the notice dated 7 Mar 2024Maharashtra Multi Year Tariff Regulations, 2024 — Draft
- Dated 7 Mar 2024Public notice: Public Notice Inviting Comments, Suggestions and Objections on Draft Regulations, March 2024
- Released with the notice dated 7 Mar 2024Explanatory memorandum: Explanatory Memorandum on Draft Multi Year Tariff Regulations, 2024
- Dated 28 Mar 2024Notice extending the date for comments: Public Notice — Extension of Time for Filing Comments on Draft Regulations
3 more documents belong here and are not on Voltaic: 1 copy in another language, 1 draft or notice on a draft not held as English text and 1 procedure or order made under it.
Voltaic last read MERC's website for final documents on 24 Nov 2026 (8 pages) and for drafts on 24 Nov 2026. A document MERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.