Skip to content

MERC · Maharashtra Electricity Regulatory Commission

Multi Year Tariff Regulations, 2024 — Statement of Reasons

MAHARASHTRA ELECTRICITY REGULATORY COMMISSION (MULTI YEAR TARIFF) REGULATIONS, 2024 – STATEMENT OF REASON

Statement of reasonsDated 19 Aug 2024

The commission's reasons for the Multi Year Tariff Regulations, 2024.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on merc.gov.in ↗

Summary

Summary written by software, from pages 1 to 28 of 157. Check the regulator's original before you rely on it.

The document is MERC's Statement of Reasons (SOR) for the Maharashtra Electricity Regulatory Commission (Multi Year Tariff) Regulations, 2024, dated 19 August 2024 (p1). It records why the Commission finalised the 2024 MYT Regulations, which are to govern the next MYT control period from FY 2025-26 to FY 2029-30 (p1, p23). It is a consultation record and explanatory note, not the regulations themselves: for each draft clause it summarises stakeholder comments, gives the Commission's analysis and decision, and reproduces the final regulation wording (p1–2). Pages 3–6 are the table of contents; pages 7–11 list abbreviations; the substantive discussion begins at page 12.

Chapter 1 (pp12–14) deals with definitions. It discusses changes to definitions such as Accounting Statement, Auxiliary Energy Consumption, Base Rate of Delayed Payment Surcharge, Plant Availability Factor, Force Majeure, Date of Commercial Operation, Cycle efficiency of Energy Storage System, Non-DPR Schemes, Transmission System User and Useful Life; the Commission finalised revisions to COD, Distribution Licensee and Useful Life and added Energy Storage System Developer (pp12–13). It also revises Due date to remove bilateral-agreement references and make 45 days from bill presentation the norm for generation, transmission, STU and MSLDC payments (pp13–14).

Chapter 2 (pp14–28) covers the general MYT framework. The Commission discontinued Mid-Term Review for generation, ESS, transmission, SLDC and STU businesses but retained it for distribution licensees, with true-up and revised forecasts for the fourth and fifth years (pp17–19). It lays out filing deadlines for MTR and true-up petitions (pp19–20). It also discusses a disincentive for non-compliance with directives (pp20–22); must-run treatment of RE in merit order despatch (pp22–23); trajectory variables including AT&C losses (pp23–24); the list of controllable and uncontrollable factors (pp24–25); the ZFAC/ZOUC pass-through mechanism (pp25–27); the sharing of gains and losses on controllable factors (pp27–28); and the tariff determination process, including technical validation sessions and public notices (p28).

The table of contents maps the rest of the document: later chapters cover power procurement (pp29–32), financial principles (pp33–58), generation norms and tariff (TOC entries pp62–92), transmission (pp93–113), distribution wires and retail supply (pp114–136), MSLDC fees and charges (pp138–140), STU fees and charges (TOC entries pp143–148), and energy storage systems (pp150–155), plus depreciation schedules (p155).

Standard name
Multi Year Tariff Regulations
Primary topics
Multi Year Tariff (MYT), Tariff determination, ARR and true-up

Read with this

The regulation

Other copies of these documents (1)

Earlier drafts

3 more documents belong here and are not on Voltaic: 1 copy in another language, 1 draft or notice on a draft not held as English text and 1 procedure or order made under it.

Voltaic last read MERC's website for final documents on 24 Nov 2026 (8 pages) and for drafts on 24 Nov 2026. A document MERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on merc.gov.in ↗

Report an issue with this document