Maharashtra Multi Year Tariff Regulations, 2024 — Draft

Maharashtra Electricity Regulatory Commission (Multi Year Tariff) Regulations, 2024

Draft regulationReleased with the notice dated 7 Mar 2024

Draft

A proposal that has since been finalised as the Multi Year Tariff Regulations, 2024.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on merc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the draft of the tariff rulebook the Maharashtra Electricity Regulatory Commission proposes to apply to every regulated electricity business in the State for the five years from 1 April 2025 to 31 March 2030 (p6). It would replace the 2019 MYT Regulations outright, while leaving the older Regulations in charge of ARR, tariff and review matters for periods up to 31 March 2025 (p6–7). It covers generating companies (including those drawing coal or lignite from an integrated mine), transmission licensees, distribution and deemed distribution licensees, the MSLDC and the STU (p6).

Framework and procedure. Part A sets the multi-year architecture — forecast ARR and revenue for each year of the control period, true-up for the first four years and provisional true-up for the fifth, and a split between controllable and uncontrollable factors, with one-third/two-thirds sharing of gains and losses and a monthly fuel adjustment charge (ZFAC) plus an annual 'other uncontrollable cost' pass-through (p28–38). Part B lays down the filing, admission, public-notice (two English and two Marathi dailies) and 120-day tariff-order procedure, and allows generators and transmission licensees to charge below the ceiling tariff by agreement (p39–45). Part C routes distribution licensees' procurement through the Resource Adequacy Regulations, 2024, Section 63 bidding, prior approval of long-term and medium-term PPAs, and a defined window for additional procurement (p46–50).

Financial principles. Part D is the accounting engine: prudence check on revenue, revenue expenditure and capex; capital cost and additional capitalisation; consumer contributions and grants; the debt:equity split; depreciation under two schedules; a base return on equity topped up by performance-linked return tied to ramp rate, mean time between failures, peak-hour availability and transmission/wires availability; interest on loan and working capital; forex variation; income tax; contingency reserves; rebates; and delayed payment charges (p51–87).

Business-specific parts. Part E governs generation tariffs — components, fuel utilisation plan, renovation and modernisation, a 'special allowance' option for plants past useful life, O&M norms and detailed thermal and hydro operating norms, capacity and energy charge computation, declared-capacity demonstration and deviation (p88–125). Part F builds a separate cost-plus methodology for the input price of coal or lignite from integrated mines, running from run-of-mine cost through overburden, GCV and non-tariff-income adjustments to credit notes (p126–139). Part G pools transmission ARRs into a total system cost and allocates it through Base Transmission Capacity Rights, with O&M norms fixed licensee by licensee (p140–160). Part H requires wires and retail supply accounts to be separated and gives a fallback allocation matrix, then sets wheeling charges and losses (p161–171). Part I covers retail supply: ARR components, sales forecast, O&M and demand-side measures, cross-subsidy and additional surcharge, distribution losses, tariff and fixed-charge determination, the 'ceiling tariff' regime for parallel licensees, and time-of-day tariffs (p172–186). Part J and Part K set fees and charges for the MSLDC and the STU, including development funds and KPI-linked incentives (p187–204). Part L creates tariff frameworks for standalone battery storage and pumped storage hydro (p205–220). Part M handles State subsidy pass-through and Part N the usual practice-direction, relax, amend and remove-difficulties powers (p221–222). Seven annexures carry the depreciation schedules, the distribution asset-allocation methodology, the competitive-bidding threshold, the life-cycle-cost format and the transmission availability computation (p223–243).

Standard name
Multi Year Tariff Regulations
Primary topics
Multi Year Tariff (MYT), Tariff determination, ARR and true-up

Read with this

The regulation

Commencement notices and reasons

Other copies of these documents (1)

Earlier drafts

3 more documents belong here and are not on Voltaic: 1 copy in another language, 1 draft or notice on a draft not held as English text and 1 procedure or order made under it.

Voltaic last read MERC's website for final documents on 24 Nov 2026 (8 pages) and for drafts on 24 Nov 2026. A document MERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on merc.gov.in ↗

Report an issue with this document