Skip to content

MERC · Maharashtra Electricity Regulatory Commission

Multi Year Tariff Regulations, 2024

Maharashtra Electricity Regulatory Commission (Multi Year Tariff) Regulations, 2024

RegulationDate not statedNo. MERC/Tech/Regulation/2024/[0512]

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on merc.gov.in ↗

Summary

Summary written by software, from pages 1 to 32 of 236. Check the regulator's original before you rely on it.

This is the Maharashtra Electricity Regulatory Commission (Multi Year Tariff) Regulations, 2024, issued as No. MERC/Tech/Regulation/2024/[0512] under the Electricity Act, 2003 (p1). It is the principal tariff framework for Maharashtra for the five-year Control Period from 1 April 2025 to 31 March 2030, and it supersedes the MERC (Multi Year Tariff) Regulations, 2019 (p1). It applies statewide to existing and future Generating Companies, Transmission Licensees, Distribution and Deemed Distribution Licensees, exempt distribution/retail supply utilities, MSLDC, STU and Energy Storage System Developers, with special treatment for generators using coal or lignite from integrated mines (p1). It comes into force on Gazette publication. Matters up to 31 March 2025 and prior-period truing-up continue under the earlier MERC tariff regulations (p2, p24).

Chapter 1 sets title, extent, applicability and commencement (p1–2). Chapter 2 is a long definitions chapter (pp2–20) covering accounting separation, ARR, availability, auxiliary consumption, energy storage, integrated mines, useful life, the Control Period, delayed-payment base rates and the Z-factor Charge. Chapter 3 states the scope: MERC will determine ARR, tariff and fees/charges for generation (excluding renewable sources), energy storage, intra-State transmission, wheeling, retail supply, MSLDC and STU fees, and cross-subsidy/additional surcharge, subject to Parts E–L (pp20–21). It also adopts tariffs discovered through Section 63 bidding rather than determining them (p21).

Part A, Chapters 4–10 (pp22–32), lays out the MYT framework. Chapter 4 requires a five-year MYT petition forecasting ARR, revenue gaps and proposed tariffs or fees; annual determination by the Commission; a mid-term review for Distribution Licensees; true-up; and mechanisms for sharing controllable gains/losses and passing through uncontrollable ones (pp22–24). Chapter 5 fixes filing deadlines and contents: MYT petition by 1 November 2024 for generators, transmission licensees, ESSD, MSLDC and STU and by 30 November 2024 for Distribution Licensees; Mid-term Review Petition by 30 November 2027; true-up petitions by 1 November 2029 and 30 November 2029 (pp24–25). It also requires accounting separation between distribution wires and retail supply, permits separate petitions for multiple licence areas, and provides for rejection or disincentives for late or non-compliant filings (pp25–26).

Chapter 6 specifies what the MYT petition must contain, including forecasts, capital investment plans, power procurement plans aligned with resource adequacy, RPO/ESO/DSM considerations, and the Commission’s power to approve with modifications or reject (pp27–28). Chapter 7 allows the Commission to set trajectories for variables such as losses, reliability indices, SAIFI/SAIDI, AT&C losses and collection/payment efficiency (p28). Chapters 8–10 govern mid-term review, classification of controllable and uncontrollable factors, and pass-through mechanisms, including monthly fuel/energy charge adjustment and the Z-factor Charge formula, quarterly approvals, forfeiture for delayed ZFAC recovery, and a FAC Stabilisation Fund (pp29–32).

Standard name
Multi Year Tariff Regulations
Primary topics
Multi Year Tariff (MYT), Tariff determination, ARR and true-up

Read with this

Commencement notices and reasons

Other copies of these documents (1)

Earlier drafts

3 more documents belong here and are not on Voltaic: 1 copy in another language, 1 draft or notice on a draft not held as English text and 1 procedure or order made under it.

Voltaic last read MERC's website for final documents on 24 Nov 2026 (8 pages) and for drafts on 24 Nov 2026. A document MERC issued after the page that lists it was read may not be held by Voltaic yet.

As of its reading of MERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on merc.gov.in ↗

Report an issue with this document