Explanatory Memorandum on Draft Multi Year Tariff Regulations, 2024

EXPLANATORY MEMORANDUM ON DRAFT MAHARASHTRA ELECTRICITY REGULATORY COMMISSION (MULTI YEAR TARIFF) REGULATIONS, 2024

Explanatory memorandum to a draftReleased with the notice dated 7 Mar 2024

Draft

The draft has since been finalised as the Multi Year Tariff Regulations, 2024.

Explanatory memorandum to the Maharashtra Multi Year Tariff Regulations, 2024 — Draft.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on merc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

The Maharashtra Electricity Regulatory Commission's March 2024 Explanatory Memorandum explains the rationale for the draft MERC (Multi Year Tariff) Regulations, 2024, proposed to govern the fifth MYT Control Period from 1 April 2025 to 31 March 2030 (p1, p13, p21). It is a decision-support document: for most clauses it states what is being changed from the 2019 Regulations and why, and reproduces proposed regulatory text (p15).

Chapter 1 sets out the legal and policy background — EA 2003 ss.61, 62 and 86(1)(a), the National Electricity Policy and Tariff Policy 2016, MoP consumer and resource-adequacy rules, and earlier MERC MYT Regulations — and flags the main new features: a separate STU fees-and-charges chapter, an ESS framework including pumped storage, and the concepts of uniform wheeling charge, ceiling tariff and supply margin (p10–16). Chapter 2 covers general principles: objectives, norms versus principles, revised definitions, the five-year control period, the MYT framework, petition timelines, penalties for non-compliance, trajectories for reliability and AT&C losses, controllable/uncontrollable factors and gain/loss sharing; it proposes to discontinue the Mid-Term Review and move to true-up at the end of the control period (p17–31).

Chapter 3 deals with power procurement planning, resource adequacy, energy efficiency, the MSKVY solar-agriculture scheme, RPO compliance and additional procurement (p32–36). Chapter 4 sets financial principles: financial prudence, capital cost and capital structure, consumer contributions, debt-equity, depreciation, return on equity using a CAPM-style analysis and performance-linked RoE, interest on loan and working capital, income tax and contingency reserves (p37–61).

Chapter 5 covers generation tariff norms for thermal and hydro stations: R&M and a special allowance, annual fixed charges, availability, heat rate, auxiliary consumption, secondary fuel oil, transit loss, O&M expenses, energy charges and hydro norms (p62–92). Chapter 6 covers intra-state transmission: licensees and applicability, TBCB threshold, tariff components, capital investment, operational norms, voltage/asset-linked O&M norms, GIS bays, minimum R&M spend, InSTS tariff sharing and a green hydrogen transmission-charge waiver (p93–117).

Chapter 7 covers distribution wires: capital investment linkage, output-based O&M norms and wheeling charges/uniform wheeling (p118–126). Chapter 8 covers retail supply: ARR components, the proposed supply margin, ceiling tariff for parallel licensees, capital investment, O&M, cross-subsidy and additional surcharge, distribution/AT&C losses, time-of-day tariff and the supply-margin/ceiling-tariff frameworks (p127–149). Chapter 9 covers MSLDC fees and charges, LDC development fund, O&M, HRD and performance-linked incentives (p150–152). Chapter 10 explains why a separate STU fees-and-charges chapter is proposed, preparatory to separating STU functions from MSETCL (p153–156). Chapter 11 summarises national ESS measures and proposes a tariff framework for BESS and pumped storage — capital cost, operating parameters, RoE, depreciation, O&M and cycle-efficiency incentives (p157–171). Chapter 12 sets the manner of state subsidy grant and reporting (p172–173).

Standard name
Multi Year Tariff Regulations
Primary topics
Multi Year Tariff (MYT), Tariff determination, ARR and true-up

Read with this

The regulation

Commencement notices and reasons

Other copies of these documents (1)

Earlier drafts

3 more documents belong here and are not on Voltaic: 1 copy in another language, 1 draft or notice on a draft not held as English text and 1 procedure or order made under it.

Voltaic last read MERC's website for final documents on 24 Nov 2026 (8 pages) and for drafts on 24 Nov 2026. A document MERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on merc.gov.in ↗

Report an issue with this document