Approval of amendments to the Detailed Procedure for Relieving Congestion in Real Time Operation, 2009 — Revision 1

Approval of amendments to the Detailed Procedure for relieving congestion in real time operation under Regulation 4 (2) of the Central Electricity Regulatory Commission (Measures to relieve congestion in real time operation) Regulations, 2009.

ProcedureDated 22 Apr 2013No.L-7/139(159)/2008 dated 22.4.2013

Made under the Measures to Relieve Congestion in Real Time Operation Regulations, 2009.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is CERC's order of 22 April 2013 approving Revision 1 of the Detailed Procedure for relieving congestion in real time operation, together with the revised procedure itself. The order records that POSOCO/NLDC petitioned (Petition No. 190/MP/2012, filed 30.8.2012) after the July 2012 grid disturbances, on the strength of a CEA-led Enquiry Committee finding that the approved procedure was inconsistent with the Congestion Charge Regulations because it required curtailment and TTC revision rather than permitting congestion charges (p1–2). POSOCO proposed applying congestion charges on entities both upstream and downstream of a congested corridor irrespective of frequency, withdrawing the non-imposition of charges in forced-outage cases, and tightening several clauses to remove ambiguity and delay (p2). The Commission approved Revision 1 in exercise of its power under Regulation 4(2) of the 2009 Regulations, and directed POSOCO to publicise the procedure, explain it to the next Operating Coordinating Committee, and operationalise it immediately (p3–4). The annexed procedure (dated 25.4.2013) defines TTC, TRM and ATC and sets out the methodology for assessing them in line with the CEA Planning Criteria; the reporting chain from SLDC to RLDC to NLDC for advance declaration; the criteria for declaring a corridor congested in real time; the sequence of warning notice and congestion-charge notice; who congestion charge applies to; the settlement and weekly accounting mechanics; and a removal-of-difficulties clause (pp5–14). Six formats for declarations and notices follow (pp15–22) thermal and reliability criteria against which TTC is tested, plus conductor-wise thermal loading tables (pp23–34).

Primary topics
Congestion and curtailment, Open access, Energy accounting and settlement

Read with this

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document