Skip to content

CERC · Central Electricity Regulatory Commission

Measures to Relieve Congestion in Real Time Operation Regulations, 2009 — Corrigendum

CENTRAL ELECTRICITY REGULATORY COMMISSION CORRIGENDUM

CorrigendumDated 4 Feb 2010Published in the Gazette 10 Feb 2010No. L-7/139(159)/2008-CERC dated 4th February, 2010

Corrects the Measures to Relieve Congestion in Real Time Operation Regulations, 2009.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a one-page CERC corrigendum, dated 4 February 2010 and carried in the Gazette of India (Extraordinary, Part III—Section 4, No. 46) of 10 February 2010, correcting the Central Electricity Regulatory Commission (Measures to Relieve Congestion in Real Time Operation) Regulations, 2009 (p1).

It makes two corrections. In Regulation 2(1)(c), the defined term "Available Transmission Capability" is substituted with "Available Transfer Capability" (p1). In Regulation 4(3), the charging words are recast: "payable by" becomes "applicable to", "overdrawing" is expanded to "overdrawing/underdrawing/over-injecting/under-injecting", and "payable" becomes "payable/receivable" (p1). The second correction materially widens the clause beyond overdrawal to underdrawal and to over- and under-injection, and makes the charge two-way.

A closing Note records the gazette publication details of the principal regulations (p1).

Primary topics
Congestion and curtailment, Deviation settlement (DSM)

Read with this

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document