CERC · Central Electricity Regulatory Commission
Measures to Relieve Congestion in Real Time Operation Regulations, 2009 — Corrigendum
CENTRAL ELECTRICITY REGULATORY COMMISSION CORRIGENDUM
CorrigendumDated 4 Feb 2010Published in the Gazette 10 Feb 2010No. L-7/139(159)/2008-CERC dated 4th February, 2010
Corrects the Measures to Relieve Congestion in Real Time Operation Regulations, 2009.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is a one-page CERC corrigendum, dated 4 February 2010 and carried in the Gazette of India (Extraordinary, Part III—Section 4, No. 46) of 10 February 2010, correcting the Central Electricity Regulatory Commission (Measures to Relieve Congestion in Real Time Operation) Regulations, 2009 (p1).
It makes two corrections. In Regulation 2(1)(c), the defined term "Available Transmission Capability" is substituted with "Available Transfer Capability" (p1). In Regulation 4(3), the charging words are recast: "payable by" becomes "applicable to", "overdrawing" is expanded to "overdrawing/underdrawing/over-injecting/under-injecting", and "payable" becomes "payable/receivable" (p1). The second correction materially widens the clause beyond overdrawal to underdrawal and to over- and under-injection, and makes the charge two-way.
A closing Note records the gazette publication details of the principal regulations (p1).
Read with this
The regulation
Amendments and corrections
Procedures and orders made under it
Other copies of these documents (1)
Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.