CERC · Central Electricity Regulatory Commission
Measures to Relieve Congestion in Real Time Operation Regulations, 2009
Central Electricity Regulatory Commission (Measures to relieve congestion in real time operation) Regulations, 2009
RegulationDated 22 Dec 2009No. L-7/139(159)/2008 dated 22nd December 2009
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is CERC's principal regulation for relieving transmission congestion in real time by means of a commercial charge. Made under s.79(1)(c) and s.178(1) of the Electricity Act 2003, it comes into force on Gazette notification and is signed by the Secretary on 22 December 2009 (p1).
Chapter I defines the working vocabulary the rest of the instrument depends on — Available Transfer Capability, Total Transfer Capability, Transmission Reliability Margin, congestion, congestion charge, control area, credible contingency and the key category of 'regional entity' whose metering and energy accounting is done at regional level (p1–2).
Chapter II is the operative core. It assigns NLDC, in consultation with RLDCs, the task of assessing TTC, ATC and TRM of inter-regional links and corridors, with RLDCs doing the same for control areas within a region, and requires the figures, their calculation basis and identified constraints to be published on NLDC/RLDC websites well in advance. It allows revision mid-course for changed system conditions and on a day-ahead basis, and contemplates use of phasor measurement data once available (p2–4). Regulations 4 to 7 make the congestion charge a commercial measure payable by the entity causing congestion and receivable by the entity relieving it, additional to Unscheduled Interchange charges, with the rate left to Commission orders and a notice procedure for switching the charge on and off (p4–5).
Chapter III requires each RLDC to run a separate 'Congestion Charge Account', operated initially like the UI account, with the balance moved to a Fund by a methodology the Commission will notify (p5). Chapter IV covers the weekly statement issued by the RPC Secretariat, the paying entity's deposit deadline and delay interest, RLDC release of amounts to entitled entities, and use of undisbursed money — with Commission approval — for congestion-relief works such as system studies, special protection schemes and shunt capacitors, reported half-yearly (p5–6). Regulations 13 and 14 route disputes to the Commission under the Conduct of Business Regulations, 1999 and give the Commission power to relax any provision after hearing (p6).
Read with this
Amendments and corrections
Procedures and orders made under it
Other copies of these documents (1)
Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.
As of its reading of CERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.