Measures to Relieve Congestion in Real Time Operation Regulations, 2009

Central Electricity Regulatory Commission (Measures to relieve congestion in real time operation) Regulations, 2009

Regulation · Gazette copyDated 22 Dec 2009Published in the Gazette 24 Dec 2009No. L-7/139(159)/2008 dated the 22nd December, 2009

The Gazette copy of the Measures to Relieve Congestion in Real Time Operation Regulations, 2009.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the CERC regulation that creates a real-time commercial mechanism to relieve congestion on inter-regional and intra-regional transmission corridors (p8). It was issued under Sections 79(1)(c) and 178(1) of the Electricity Act, 2003, and commences from the date of its notification in the Official Gazette (p8), the Gazette issue being dated 24 December 2009 (p1).

Chapter I sets the short title and commencement and defines the operational vocabulary the whole instrument rests on — Available Transfer Capability, Total Transfer Capability, Transmission Reliability Margin, congestion, congestion charge, control area, credible contingency and regional entity (p8–9).

Chapter II is the operative core. Regulation 3 assigns NLDC the job of assessing and revising TTC, ATC and TRM for inter-regional links in consultation with RLDCs and the CTU, with publication of the figures and their basis on NLDC/RLDC websites well in advance, plus seasonal reliability studies and provision for day-ahead revision and future use of PMU measurements; RLDCs do the same for control areas within a region (p9–10). Regulations 4 to 7 establish the congestion charge itself: who pays and who receives, that it is levied in addition to Unscheduled Interchange charges, that the Commission fixes the rate by separate order, and the warning and notice procedure — including the minimum notice blocks — for applying and withdrawing the charge (p11–12).

Chapter III requires each RLDC to keep a separate "Congestion Charge Account" and to move balances to a Fund under a methodology the Commission will notify (p12). Chapter IV covers weekly statements through the RPC Secretariat, deposit timelines with interest for late payment, release of amounts to entitled entities, use of undisbursed money for congestion-relief works with Commission approval, dispute resolution through the Commission under its Conduct of Business Regulations, and a power to relax (p12–13).

Primary topics
Congestion and curtailment, Deviation settlement (DSM), Energy accounting and settlement

Read with this

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document