RERC · Rajasthan Electricity Regulatory Commission

Electricity Supply Code and Connected Matters, 2004 — Third Amendment Regulations, 2006

The Rajasthan Electricity Regulatory Commission (Electricity Supply Code and Connected Matters) (Third Amendment) Regulations, 2006.

AmendmentDated 15 Feb 2006No. RERC/Secy/Reg. 44 dated 15th February , 2006

Replaced by Electricity Supply Code and Connected Matters Regulations, 2021

See that regulation for the date it took effect and for anything it keeps in force.

Amends a regulation Voltaic does not hold.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on rerc.rajasthan.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the Rajasthan Electricity Regulatory Commission's Third Amendment to its (Electricity Supply Code and Connected Matters) Regulations, 2004, issued as Notification No. RERC/Secy/Reg. 44 from Jaipur on 15 February 2006 under sections 43 to 48, 50, 55 and 56 read with section 181 of the Electricity Act 2003 (p1). It is a short, targeted set of clause-level changes, not a fresh code. It comes into force on publication in the official gazette, but the gazette date is not printed in this text, so the operative date cannot be fixed from the document itself (p1).

The centrepiece is Regulation 2(3), which inserts sub-clauses 6(9) and 6(10) on single point supply (p2–3). A registered Cooperative Group Housing Society that owns the premises, or a person acting as an Employer, may apply for a single point supply to serve members or employees living in the same premises, without taking away an individual occupant's right to demand supply directly from the area licensee. Sub-clause (10) lays down the conditions: charges capped at the Commission's Schedule and at the residential tariff, dual obligations as both applicant and licensee, application for the whole colony's connected load, metering of every individual connection, conformity with safety rules, and publication of Commission-approved supply terms in terms of clause 44.

Regulation 2(1)–(2) makes procedural concessions on connection priority: an HT applicant may deposit security with the demand notice without losing priority, and an agriculture or HT applicant who furnishes the L-form separately after the application keeps the priority of release (p1). Regulation 2(4) amends the proviso to clause 25(1), substituting "9.6.2008" for "March 31, 2005" and adding a proviso that unmetered public street lighting supply shall not continue beyond 9.12.05 (p3). Regulation 2(5) adds a proviso to clause 29(1)(iii) so that, until tariffs specify a flat rate for agricultural consumers, consumption is charged at the flat-rate agricultural rates (p3).

Standard name
Electricity Supply Code
Primary topics
Supply to buildings and colonies, Conditions of supply, Metering

Read with this

Voltaic does not hold the regulation itself.

Consolidated copies, for reference (1)

Voltaic last read RERC's website for final documents on 24 Nov 2026. A document RERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on rerc.rajasthan.gov.in ↗

Report an issue with this document