RERC · Rajasthan Electricity Regulatory Commission
Electricity Supply Code and Connected Matters, 2004 — Third Amendment Regulations, 2006
The Rajasthan Electricity Regulatory Commission (Electricity Supply Code and Connected Matters) (Third Amendment) Regulations, 2006.
AmendmentDated 15 Feb 2006No. RERC/Secy/Reg. 44 dated 15th February , 2006
Replaced by Electricity Supply Code and Connected Matters Regulations, 2021
See that regulation for the date it took effect and for anything it keeps in force.
Amends a regulation Voltaic does not hold.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is the Rajasthan Electricity Regulatory Commission's Third Amendment to its (Electricity Supply Code and Connected Matters) Regulations, 2004, issued as Notification No. RERC/Secy/Reg. 44 from Jaipur on 15 February 2006 under sections 43 to 48, 50, 55 and 56 read with section 181 of the Electricity Act 2003 (p1). It is a short, targeted set of clause-level changes, not a fresh code. It comes into force on publication in the official gazette, but the gazette date is not printed in this text, so the operative date cannot be fixed from the document itself (p1).
The centrepiece is Regulation 2(3), which inserts sub-clauses 6(9) and 6(10) on single point supply (p2–3). A registered Cooperative Group Housing Society that owns the premises, or a person acting as an Employer, may apply for a single point supply to serve members or employees living in the same premises, without taking away an individual occupant's right to demand supply directly from the area licensee. Sub-clause (10) lays down the conditions: charges capped at the Commission's Schedule and at the residential tariff, dual obligations as both applicant and licensee, application for the whole colony's connected load, metering of every individual connection, conformity with safety rules, and publication of Commission-approved supply terms in terms of clause 44.
Regulation 2(1)–(2) makes procedural concessions on connection priority: an HT applicant may deposit security with the demand notice without losing priority, and an agriculture or HT applicant who furnishes the L-form separately after the application keeps the priority of release (p1). Regulation 2(4) amends the proviso to clause 25(1), substituting "9.6.2008" for "March 31, 2005" and adding a proviso that unmetered public street lighting supply shall not continue beyond 9.12.05 (p3). Regulation 2(5) adds a proviso to clause 29(1)(iii) so that, until tariffs specify a flat rate for agricultural consumers, consumption is charged at the flat-rate agricultural rates (p3).
Read with this
Voltaic does not hold the regulation itself.
Amendments and corrections
Consolidated copies, for reference (1)
- Dated 9 Jun 2004Electricity Supply Code and Connected Matters Regulations, 2004
Voltaic last read RERC's website for final documents on 24 Nov 2026. A document RERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.