RERC · Rajasthan Electricity Regulatory Commission
Electricity Supply Code and Connected Matters Regulations, 2004 — Tenth Amendment, 2013
The Rajasthan Electricity Regulatory Commission (Electricity Supply Code and Connected Matters)(Tenth Amendment) Regulations, 2013
AmendmentDated 8 Aug 2013No. RERC/Secy/Reg.100 dated 8th August, 2013
Replaced by Electricity Supply Code and Connected Matters Regulations, 2021
See that regulation for the date it took effect and for anything it keeps in force.
Amends a regulation Voltaic does not hold.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is the Tenth Amendment to the Rajasthan Electricity Regulatory Commission (Electricity Supply Code and Connected Matters) Regulations, 2004, issued from Jaipur on 8 August 2013 under the connection and supply provisions (ss. 43–48, 50, 55, 56) read with s. 181 of the Electricity Act 2003 (p1). It takes effect from the date of publication in the official gazette, which is not printed in the text (p1).
The amendment is narrow and centres on Regulation 11(6), which governs building complexes and large buildings. It replaces clause (a) so that where the estimated designed demand, calculated from the covered area on an area-per-1000-sq-ft basis by building type (domestic or non-domestic), exceeds 50 kVA, the owner, builder, developer or group of consumers must install its own transformer and associated equipment; it also sets out the area-based method for deriving estimated connected load and converting it into designed demand (p1–2). It then adds a right to install a transformer of higher capacity than the calculation yields (p2); an exemption for large buildings taking a single connection up to 50 kVA (p2); and a new clause (h) giving a carve-out for buildings that had a connection before 31.12.2010 and never installed their own transformer, requiring the licensee to give further connections or load extension against the Schedule charges and to bear any system augmentation cost itself (p2). Finally, the phrase "Designed Maximum Demand" is substituted throughout the 2004 Regulations with "Estimated Designed Demand" (p3).
Read with this
Voltaic does not hold the regulation itself.
Amendments and corrections
Consolidated copies, for reference (1)
- Dated 9 Jun 2004Electricity Supply Code and Connected Matters Regulations, 2004
Voltaic last read RERC's website for final documents on 24 Nov 2026. A document RERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.