The Rajasthan Electricity Regulatory Commission (Electricity Supply Code and Connected Matters) Regulations, 2004

Consolidated copyDated 9 Jun 2004No. RERC/Secy/ Reg. -26 dated 9th June,2004

Replaced by Electricity Supply Code and Connected Matters Regulations, 2021

See that regulation for the date it took effect and for anything it keeps in force.

A consolidated copy of a regulation Voltaic does not hold, published by RERC for reference. It may not include the latest amendments; read it with the amendments listed for the regulation.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on rerc.rajasthan.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

The notification (p3) establishes the Rajasthan Electricity Regulatory Commission (Electricity Supply Code and Connected Matters) Regulations, 2004, for distribution licensees in Rajasthan. It is to come into force from publication in the official gazette, though the gazette date is not printed; the notification is dated 9 June 2004 (p3).

Clauses 1–2 define the regulation's scope, key terms and the role of the Schedule (pp3–4). Clauses 3–5 specify supply voltages and frequency, consumer categories and character of service by load/demand and voltage, and point of supply (pp4–6). Clauses 6–15 set the process for new connections: application, fees and security, incomplete applications, supply with and without mains extension or new substations, localities without supply, applicant-provided line/plant, priority register, withdrawal, delay and relaxation for events beyond the licensee's control (pp6–10).

Clauses 16–25 deal with security for electricity and meters, annual review, additional or excess security, interest, failure to pay, prepaid meters, refund and metering; agriculture consumers being supplied without a meter must cease such supply beyond March 31,2005 (pp10–12). Clauses 26–37 govern charges and tariff publication, meter reading, inaccessible/stopped/defective/lost meters, check meters, billing content and payment, delayed payment surcharge, and refunds of excess amounts (pp12–16). Clauses 38–43 cover disconnection for non-payment, recovery of old dues, restoration, tampering or damage, licensee entry powers, and increase in connected load/demand (pp17–18). Clause 44 requires the licensee to issue detailed terms and conditions with prior Commission approval (p19).

The Schedule (pp20–24) specifies fees, deposits for line/plant and mains extension, meter security, rentals, temporary connection charges and reconnection charges. Annexure-1 (p25) prescribes how LT connected load is determined, including appliance ratings and diversity factors.

Standard name
Electricity Supply Code
Primary topics
Conditions of supply, New connections and load changes, Billing and payment

Read with this

Voltaic last read RERC's website for final documents on 24 Nov 2026. A document RERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on rerc.rajasthan.gov.in ↗

Report an issue with this document