RERC · Rajasthan Electricity Regulatory Commission
Electricity Supply Code and Connected Matters Regulations, 2004
The Rajasthan Electricity Regulatory Commission (Electricity Supply Code and Connected Matters) Regulations, 2004
Consolidated copyDated 9 Jun 2004No. RERC/Secy/ Reg. -26 dated 9th June,2004
Replaced by Electricity Supply Code and Connected Matters Regulations, 2021
See that regulation for the date it took effect and for anything it keeps in force.
A consolidated copy of a regulation Voltaic does not hold, published by RERC for reference. It may not include the latest amendments; read it with the amendments listed for the regulation.
Summary
Summary written by software. Check the regulator's original before you rely on it.
The notification (p3) establishes the Rajasthan Electricity Regulatory Commission (Electricity Supply Code and Connected Matters) Regulations, 2004, for distribution licensees in Rajasthan. It is to come into force from publication in the official gazette, though the gazette date is not printed; the notification is dated 9 June 2004 (p3).
Clauses 1–2 define the regulation's scope, key terms and the role of the Schedule (pp3–4). Clauses 3–5 specify supply voltages and frequency, consumer categories and character of service by load/demand and voltage, and point of supply (pp4–6). Clauses 6–15 set the process for new connections: application, fees and security, incomplete applications, supply with and without mains extension or new substations, localities without supply, applicant-provided line/plant, priority register, withdrawal, delay and relaxation for events beyond the licensee's control (pp6–10).
Clauses 16–25 deal with security for electricity and meters, annual review, additional or excess security, interest, failure to pay, prepaid meters, refund and metering; agriculture consumers being supplied without a meter must cease such supply beyond March 31,2005 (pp10–12). Clauses 26–37 govern charges and tariff publication, meter reading, inaccessible/stopped/defective/lost meters, check meters, billing content and payment, delayed payment surcharge, and refunds of excess amounts (pp12–16). Clauses 38–43 cover disconnection for non-payment, recovery of old dues, restoration, tampering or damage, licensee entry powers, and increase in connected load/demand (pp17–18). Clause 44 requires the licensee to issue detailed terms and conditions with prior Commission approval (p19).
The Schedule (pp20–24) specifies fees, deposits for line/plant and mains extension, meter security, rentals, temporary connection charges and reconnection charges. Annexure-1 (p25) prescribes how LT connected load is determined, including appliance ratings and diversity factors.
Read with this
Voltaic does not hold the regulation itself.
Amendments and corrections
- Dated 4 Jan 2005Electricity Supply Code and Connected Matters, 2004 — First Amendment, 2004
- Dated 15 Feb 2006Electricity Supply Code and Connected Matters, 2004 — Third Amendment Regulations, 2006
- Dated 22 Jan 2007Electricity Supply Code and Connected Matters, 2004 — Sixth Amendment, 2007
- Dated 8 Aug 2013Electricity Supply Code and Connected Matters Regulations, 2004 — Tenth Amendment, 2013
Voltaic last read RERC's website for final documents on 24 Nov 2026. A document RERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.