RERC · Rajasthan Electricity Regulatory Commission
Renewable Energy Obligation Regulations, 2007 — 2nd Amendment, 2014
Rajasthan Electricity Regulatory Commission (Renewable Energy Obligation)(2nd Amendment) Regulations, 2014
AmendmentDated 30 May 2014No. RERC/Secy/Regulation-108 dated May 30, 2014
Replaced by Rajasthan Renewable Purchase Obligation Regulations, 2023
See that regulation for the date it took effect and for anything it keeps in force.
Amends the Rajasthan Renewable Energy Obligation Regulations, 2007.
Saving clause of the regulation that replaces it: “Notwithstanding such repeal anything done or action taken or purported to have been done for the purpose of meeting RE obligation shall be deemed to have been done or taken under the corresponding provisions of these Regulations.”
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is the second amendment to the Rajasthan Electricity Regulatory Commission (Renewable Energy Obligation) Regulations, 2007, issued at Jaipur on 30 May 2014 under file No. RERC/Secy/Regulation-108 (p1). It comes into force from the date of publication in the Official Gazette; that Gazette date is not printed anywhere in the text (p1).
Clause 1 gives the short title and commencement (p1). Clause 2 replaces regulation 2 wholesale rather than amending it piecemeal: captive power plants (CPP) take the meaning assigned in the RERC (CPP) Regulations 2010, and renewable energy (RE) takes the meaning in the RERC (Terms and Conditions for Determination of Tariff) Regulations 2004, expressly including cogeneration. Residuary words and expressions are to be read, in a stated order of precedence, from the RERC CPP Regulations 2010, the RERC Open Access Regulations 2004 and the Electricity Act 2003 (p1).
Clause 3 is the operative core. It replaces the table in regulation 4(2) with two tables that fix the renewable purchase obligation trajectory. Class A covers CPP and open access consumers with total capacity of 10 MW and above, and sets a year-wise obligation split into non-solar, solar and total percentages for 2014-15, 2015-16 and 2016-17 (p2). Class B covers CPP and open access consumers with capacity of 1 MW and above but less than 10 MW, and sets a single combined obligation percentage for the same three years (p2). The two classes carry the same total obligation in each year; only the way it is expressed differs. The notification is signed by the Secretary, G.K. Sharma (p2), and states no repeal or savings provision.
Read with this
The regulation
- Dated 23 Mar 2007Rajasthan Renewable Energy Obligation Regulations, 2007
Amendments and corrections
- Dated 24 May 2011Renewable Energy Obligation Regulations, 2007 — 1st Amendment, 2011
- Dated 18 Mar 2015Renewable Energy Obligation Regulations, 2007 — Third Amendment, 2015
- Dated 7 Jun 2017Renewable Energy Obligation Regulations, 2007 — Fourth Amendment, 2017
- Dated 11 Jan 2019Renewable Energy Obligation Regulations, 2007 — Fifth Amendment, 2019
- Dated 4 Feb 2020Renewable Energy Obligation Regulations, 2007 — Sixth Amendment, 2020
- Dated 14 Dec 2021Renewable Energy Obligation (Seventh Amendment) Regulations, 2021
- Dated 23 Dec 2010Changes some provisions: Renewable Energy Certificate and Renewable Purchase Obligation Compliance Framework Regulations, 2010
Voltaic last read RERC's website for final documents on 24 Nov 2026. A document RERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.