RERC · Rajasthan Electricity Regulatory Commission
Renewable Energy Obligation (Seventh Amendment) Regulations, 2021
Rajasthan Electricity Regulatory Commission (Renewable Energy Obligation) (Seventh Amendment) Regulations, 2021
AmendmentDated 14 Dec 2021Published in the Gazette 9 Feb 2022No. RERC/Secy./Reg.145 dated December 14, 2021
Replaced by Rajasthan Renewable Purchase Obligation Regulations, 2023
See that regulation for the date it took effect and for anything it keeps in force.
Amends the Rajasthan Renewable Energy Obligation Regulations, 2007.
Saving clause of the regulation that replaces it: “Notwithstanding such repeal anything done or action taken or purported to have been done for the purpose of meeting RE obligation shall be deemed to have been done or taken under the corresponding provisions of these Regulations.”
Summary
Summary written by software. Check the regulator's original before you rely on it.
The Rajasthan Electricity Regulatory Commission (RERC) issued this Seventh Amendment to the RERC (Renewable Energy Obligation) Regulations, 2007 by notification No. RERC/Secy./Reg.145 dated Jaipur, 14 December 2021 (p4). It comes into force on publication in the Official Gazette and applies throughout Rajasthan (p4); the Gazette header shows 9 February 2022 (p1).
The amendment has three operative parts. First, it rewrites the definition of “Renewable Energy” or “RE” in Regulation 2(1) II, tying it to the RERC (Terms and Conditions for Determination of Tariff from Renewable Energy Sources) Regulations, 2020, and expressly including cogeneration (p4).
Second, it substitutes the FY 2021-22, 2022-23 and 2023-24 entries in the obligation tables under Regulation 4(2)(A), 4(2)(B) and 4(3) (p4–5). The tables set solar, non-solar, wind, biomass and hydro purchase obligation percentages and total RPO as a percentage of energy consumption, with one table excluding consumption met from hydro sources (p4–5). A new proviso allows shortfall in one RPO category to be met from excess energy in another where compliance in the relevant category reaches 80% or more (p5).
Third, for the same financial years, it adds provisos on the Hydro Power Purchase Obligation (HPO). HPO must be met from eligible large hydro projects, including pumped storage, above 25 MW commissioned between 08.03.2019 and 31.03.2024, in respect of 70% of total generated capacity for 12 years from commissioning; free power and Local Area Development Fund contributions are excluded from that 70% (p6). HPO liability of the State/Discom may be met from free power from such projects, excluding LADF, if consumed within the State/Discom (p6). Hydro imported from outside India cannot meet HPO (p6).
Read with this
The regulation
- Dated 23 Mar 2007Rajasthan Renewable Energy Obligation Regulations, 2007
Amendments and corrections
- Dated 24 May 2011Renewable Energy Obligation Regulations, 2007 — 1st Amendment, 2011
- Dated 30 May 2014Renewable Energy Obligation Regulations, 2007 — 2nd Amendment, 2014
- Dated 18 Mar 2015Renewable Energy Obligation Regulations, 2007 — Third Amendment, 2015
- Dated 7 Jun 2017Renewable Energy Obligation Regulations, 2007 — Fourth Amendment, 2017
- Dated 11 Jan 2019Renewable Energy Obligation Regulations, 2007 — Fifth Amendment, 2019
- Dated 4 Feb 2020Renewable Energy Obligation Regulations, 2007 — Sixth Amendment, 2020
- Dated 23 Dec 2010Changes some provisions: Renewable Energy Certificate and Renewable Purchase Obligation Compliance Framework Regulations, 2010
Voltaic last read RERC's website for final documents on 24 Nov 2026. A document RERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.