RERC · Rajasthan Electricity Regulatory Commission
Rajasthan Renewable Energy Obligation Regulations, 2007
Rajasthan Electricity Regulatory Commission (Renewable Energy Obligation) Regulations, 2007
RegulationDated 23 Mar 2007No. RERC/Secy/Reg/ 66 dated 23 March 2007
Replaced by Rajasthan Renewable Purchase Obligation Regulations, 2023
See that regulation for the date it took effect and for anything it keeps in force.
Saving clause of the regulation that replaces it: “Notwithstanding such repeal anything done or action taken or purported to have been done for the purpose of meeting RE obligation shall be deemed to have been done or taken under the corresponding provisions of these Regulations.”
Summary
Summary written by software. Check the regulator's original before you rely on it.
The document is a 2007 principal regulation by the Rajasthan Electricity Regulatory Commission, issued as Notification No. RERC/Secy/Reg/66 from Jaipur on 23 March 2007 (p1). It is made under section 86(1)(e) read with section 181 of the Electricity Act, 2003, and is titled the RERC (Renewable Energy Obligation) Regulations, 2007. Its commencement is conditional: it comes into force from Gazette publication or 01-04-2007, whichever is later; the Gazette date is not printed in the text (p1).
The opening table on p1 sets a year-wise Renewable Energy Obligation trajectory for distribution licensees for 2007-08 through 2011-12. Regulation 1 gives the short title and conditional commencement. Regulation 2 defines Captive Power Plant, Renewable Energy and Renewable Energy Surcharge by reference to other RERC regulations and establishes an order of interpretation. Regulation 3 makes the regulations applicable to distribution licensees including deemed licensees, open access consumers, and captive power plants of 1 MW and above. Regulation 4 imposes RE Obligation on electricity drawn from CPPs and through open access, while distribution licensee compliance is routed to the RERC Power Purchase & Procurement Regulations, 2004; a sub-clause (2) is missing in the text. Regulation 5 requires shortfall to be paid as RE Surcharge to the State Transmission Utility, credits collections to a fund for RE transmission infrastructure, and provides for the Commission to notify the surcharge from time to time—setting Rs. 3.59/kwh for 2007-08 until revised (p1).
Read with this
Amendments and corrections
- Dated 24 May 2011Renewable Energy Obligation Regulations, 2007 — 1st Amendment, 2011
- Dated 30 May 2014Renewable Energy Obligation Regulations, 2007 — 2nd Amendment, 2014
- Dated 18 Mar 2015Renewable Energy Obligation Regulations, 2007 — Third Amendment, 2015
- Dated 7 Jun 2017Renewable Energy Obligation Regulations, 2007 — Fourth Amendment, 2017
- Dated 11 Jan 2019Renewable Energy Obligation Regulations, 2007 — Fifth Amendment, 2019
- Dated 4 Feb 2020Renewable Energy Obligation Regulations, 2007 — Sixth Amendment, 2020
- Dated 14 Dec 2021Renewable Energy Obligation (Seventh Amendment) Regulations, 2021
- Dated 23 Dec 2010Changes some provisions: Renewable Energy Certificate and Renewable Purchase Obligation Compliance Framework Regulations, 2010
Voltaic last read RERC's website for final documents on 24 Nov 2026. A document RERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.