Rooftop Solar PV Grid Interactive System and Net/Gross Metering (Fourth Amendment) Regulations, 2024

JSERC(Rooftop Solar PV Grid Interactive System and Net/Gross Metering) (Fourth Amendment) Regulations, 2024

AmendmentDated 29 May 2024Published in the Gazette 13 Jun 2024Notification no.102 dated 29th May, 2024

Amends the Rooftop Solar PV Grid Interactive Systems and Net/Gross Metering Regulations, 2015.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on jserc.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a two-page amendment by the Jharkhand State Electricity Regulatory Commission to its 2015 rooftop solar metering regulations, issued, in the Commission's words, to promote renewable generation in Jharkhand (p1). Notification no.102 dated 29 May 2024 was published in the Jharkhand Gazette Extraordinary of 13 June 2024 (p1).

The operative change is a single inserted proviso to clause 7.3 of Chapter A7 of the Principal Regulations (p2). It creates a deemed-acceptance route: applications for rooftop solar PV systems up to 10 kW capacity, complete in all respects, are deemed accepted without requiring a technical feasibility study, and the distribution licensee must carry out any commensurate enhancement of the consumer's sanctioned load that is required (p2).

The amendment reproduces clause 7.3, which supplies the surrounding process: feasibility analysis within fifteen days of receipt of application, one month's validity for that feasibility unless extended by the distribution licensee, and a thirty-day outer limit for intimating feasibility where an interconnection study is needed (p2).

Regulation 1 gives the title, territorial extent to Jharkhand, and commencement from Gazette publication unless reviewed earlier or extended by the Commission (p1). The amendment is made under s.181(1) read with s.61(h) and s.86(1)(a), (b) and (e) of the Electricity Act 2003 (p1). For analysts tracking small rooftop interconnection, the item to note is the 10 kW carve-out from technical feasibility scrutiny.

Standard name
Net Metering and Rooftop Solar
Primary topics
Net metering, New connections and load changes

Read with this

Voltaic last read JSERC's website for final documents on 24 Nov 2026 (5 pages) and for drafts on 21 Nov 2026. A document JSERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on jserc.org ↗

Report an issue with this document