JSERC · Jharkhand State Electricity Regulatory Commission
Rooftop Solar PV Grid Interactive System and Net/Gross Metering (Third Amendment) Regulations, 2023
JSERC(Rooftop Solar PV Grid Interactive System and Net/Gross Metering) (Third Amendment) Regulations, 2023
AmendmentDated 22 Nov 2023Published in the Gazette 29 Nov 2023Notification no. 93 dated 22 nd November, 2023
Amends the Rooftop Solar PV Grid Interactive Systems and Net/Gross Metering Regulations, 2015.
Summary
Summary written by software. Check the regulator's original before you rely on it.
A two-page notification by which the Jharkhand State Electricity Regulatory Commission amends its 2015 rooftop solar net/gross metering regulations (p1–2). The Commission states the purpose is to promote renewable energy generation in Jharkhand, and it exercises its Electricity Act, 2003 powers to amend the Principal Regulations (p1).
Regulation 1 gives the short title, extends the amendment to the whole State of Jharkhand, and brings it into force on Gazette publication unless the Commission reviews it earlier or extends it (p2).
Regulation 2 is the only substantive provision: it inserts a new proviso into clause 5.1 of Chapter A5 of the Principal Regulations (p2). Clause 5.1 caps a grid-connected rooftop solar PV installation at 100% of the consumer's sanctioned connected load / contract demand; the proviso lifts that load-linked ceiling for domestic consumers, so their installed capacity is irrespective of sanctioned load/contract demand (p2).
Nothing else in the 2015 framework — metering arrangements, eligibility or interconnection — is restated or changed here (p2).
Read with this
The regulation
Amendments and corrections
- Dated 19 Feb 2019Rooftop Solar PV Grid Interactive Systems and Net/Gross Metering Regulations, 2015 — 1st Amendment, 2019
- Dated 31 Dec 2020Rooftop Solar PV Grid Interactive Systems and Net/Gross Metering Regulations, 2015 — Second Amendment, 2020
- Dated 29 May 2024Rooftop Solar PV Grid Interactive System and Net/Gross Metering (Fourth Amendment) Regulations, 2024
- Dated 26 Nov 2024Rooftop Solar PV Grid Interactive System and Net/Gross Metering Regulations, 2015 — Fifth Amendment, 2024
- Dated 17 Apr 2025Rooftop Solar PV Grid Interactive System and Net/Gross Metering Regulations, 2015 — Sixth Amendment, 2025
- Dated 30 Jan 2026Rooftop Solar PV Grid Interactive System and Net/Gross Metering (Seventh Amendment) Regulations, 2026
Procedures and orders made under it
- Date not statedRooftop Solar PV Gross/Net Metering Tariff, FY 2018-19